HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • From the first estimate to the tender
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • Add-on modules
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor: the firm and each contract

Bills of Quantities

  • Checking an Excel BoQ
  • Build a BoQ
  • BoQ templates
  • BoQ assemblies
  • Import quantities
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Explain a quantity
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Check before tender
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Drawing sets: Start from Drawings
  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Measure the plan
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Quantity Register
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure
  • Bar Bending Schedules

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Plant and Equipment

  • The machine register
  • Import machines from Excel
  • Daily log
  • Charge machines to our contracts
  • Fuel
  • Hiring machines out
  • Service and repairs
  • Plant profit and alerts
  • Plant from the site phone

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Take-off

Send to the BoQ

Put measurements on BoQ items, make a new item from the drawing, and what stays linked after sending.

A measurement counts in the BoQ once it is sent: it becomes a row of its BoQ item's measurement sheet, and the item's quantity is the total of the sheet. The link stays: change the measurement and the row follows.

The two tabs of the panel

TabShowsUsed for
By roomEach measurement (a room, a wall, a door mark) on one line: its name, its quantity and its status. Click it to open its items, BoQ items, formulas and settings.Checking and changing what was measured.
By BoQ itemOne line per piece of work: the total of every measurement that goes to the same BoQ item (or comes from the same assembly item), with how many rooms it comes from.Choosing the BoQ items: once per line, not once per room.
Status of a lineMeans
To checkAdded by Measure the Plan and not accepted yet: never sent.
No BoQ itemIt, or one of its items, has no BoQ item.
ReadyEvery item has its BoQ item: it goes with the next Send to BoQ.
SentOn the measurement sheets; it follows every change by itself.

Send

  1. 1Open By BoQ item. Each line shows the BoQ item HodariQ found by its words, or Choose BoQ item….
  2. 2Choose the BoQ item of each line that has none. The choice goes to every measurement of the line at once, e.g. the screed of all seven rooms.
  3. 3Or press Create the BoQ items (N) to make the missing ones (see below).
  4. 4Press Send to BoQ (N). Everything ready goes to the measurement sheets; the message says how many went and what waits.

A measurement is ready when its BoQ item is chosen, it is not To check, and its page's scale is confirmed (a count needs no scale). Rows already sent are not sent again: they follow their measurement.

Create the BoQ items

Create the BoQ items gives every measurement without a BoQ item its item, in this order:

  1. 1An item already in the BoQ with the same description and unit (spaces and capitals apart) is used: never a second item of the same work.
  2. 2Else a new item is made, with the assembly item's BoQ description and unit, in its Bill. The bill is found by its title, or made with the next bill number (after 11 comes 12).
  3. 3A measurement with no assembly gets an item named after what it is (BEDROOM - floor gives Floor), in the bill Measured items.
  4. 4A deduction (a door off the walling) is only put on an item that is already there. If the work it comes off is not measured yet, it waits: an item of deductions alone would be negative.

The new items have no quantity and no rate: they get their quantity when sent, and are priced as any other item. Works only on a BoQ in Draft or Tender; in a variation order, choose its lines.

Deductions never make an item negative

At Send to BoQ, HodariQ adds up each BoQ item as it would be after sending. A deduction that would take an item below zero (the door is measured, the wall is not) is held back, and the message says so: measure the wall, then send again. The measured work is always sent before its deductions.

ExampleExternal walls 25.2 m x 3 m, two doors and a window off them
Walling, 25.2 x 375.600 m2
Less door D01, 0.9 x 2.1(1.890)
Less door D02, 1.0 x 2.1(2.100)
Less window W01, 1.2 x 1.2(1.440)
Block walling 200 mm70.170 m2

What the row on the sheet holds

The row is named after the drawing, the page, the zone and the measurement, e.g. A-101 Ground floor plan, p.1 [Ground floor]: External walls. Its figures are written the way a QS writes dimension paper:

MeasurementTimesNo.LengthHeightFrom drawing
A lengthits ×1the lengthits height, if any
An areaits ×1its depth, if anythe area
A countits ×the number
An assembly itemthe measurement's ×1the formula's quantity

Ticked Deduct, the row is negative. The take-off's rows come after any rows already on the sheet. An item that had a quantity typed before anything was sent keeps it as its first row, Quantity before measuring, so nothing typed is lost.

What stays linked

  • Changing a sent measurement (its points, height, times, zone, pitch, deduct, the page's scale) changes its row at once. Update sends it again by hand; it never adds a second row.
  • Choosing another BoQ item for a sent measurement moves its row to that item.
  • Deleting a measurement deletes its row, and those of its assembly items.
  • A measurement is sent to one item. To fill several items from one measurement, use an assembly.

Units must agree

A measurement gives m, m2, m3 or No. Sent to an item measured in another of those four units, HodariQ refuses, e.g. Wall gives m2 but 2/A is measured in m3. Give the measurement a height or depth, or choose the right item. Items in other units (kg, item, sum) are not checked: the figure goes as it is.

An item that is not in the BoQ yet

  1. 1In BoQ item… choose + New item… at the top of the list.
  2. 2Check Description (it starts as the measurement's) and Unit (the measurement's), and type a Rate (optional).
  3. 3Choose the Bill, or + New bill… with its Bill No. (the next number is offered) and Bill title.
  4. 4Press Add item: the item is made in the BoQ and chosen. Then press Send.

In a variation order the new item is an addition at a new rate, with a quantity of 1 until the measurement is sent and gives it its quantity.

When the BoQ is locked

Measurements go only to a BoQ in Draft or Tender, or a variation order in Draft. Once the BoQ becomes the Contract BoQ, or the VO is submitted, the take-off shows Read only: the BoQ or VO is locked, and the rows are locked with their document. Changes then come by a revised drawing and a variation order. Queries can still be raised.

Good to know

Without a scale a length or area cannot be sent (Set the scale of page 2 before sending its measurements); counts can.

← PreviousZonesNext →Quantity Register

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • The two tabs of the panel
  • Send
  • Create the BoQ items
  • Deductions never make an item negative
  • What the row on the sheet holds
  • What stays linked
  • Units must agree
  • An item that is not in the BoQ yet
  • When the BoQ is locked