HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • From the first estimate to the tender
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • Add-on modules
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor: the firm and each contract

Bills of Quantities

  • Checking an Excel BoQ
  • Build a BoQ
  • BoQ templates
  • BoQ assemblies
  • Import quantities
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Explain a quantity
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Check before tender
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Drawing sets: Start from Drawings
  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Measure the plan
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Quantity Register
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure
  • Bar Bending Schedules

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Plant and Equipment

  • The machine register
  • Import machines from Excel
  • Daily log
  • Charge machines to our contracts
  • Fuel
  • Hiring machines out
  • Service and repairs
  • Plant profit and alerts
  • Plant from the site phone

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Getting started

From the first estimate to the tender

Where to start, what each step takes in and gives out: cost plan, contract, BoQ, take-off, schedules, pricing, checks, tender, Cost Check.

HodariQ follows the order of a QS's work. Each step takes something in and gives something out; nothing is sent backwards. Quantities go one way only: from the drawings, schedules and sheets into the BoQ. The cost plan never feeds the BoQ: it is the estimate the BoQ is checked against at the end.

The steps

StepWhereTakes inGives out
1. Cost plan (optional)Estimating › Cost PlansFloor area, building type, region; costs of past projects, library rates or quantities from a scheme drawingThe estimate for the client, per element and per m2. Nothing goes to the BoQ.
2. ContractContracts › ContractsParties, dates, termsThe place every document of the job belongs to. A draft contract is enough to start measuring.
3. BoQEstimating › Bills of QuantitiesNothing yet: it can start empty, or be imported from ExcelThe bills and items the quantities go into
4. Drawings & Take-offEstimating › Drawings & Take-offThe PDF drawings and their scaleMeasurements: rooms, walls, openings, assemblies (see Take-off)
5. Bar Bending SchedulesEstimating › Bar Bending SchedulesBars by member, size and shapekg of each bar size
6. Into the BoQBy BoQ item › Create the BoQ items › Send to BoQ (drawing); Send to BoQ (schedule)The measurements and the kgBoQ items with their measurement rows; every quantity explained back to its drawing or schedule
7. PriceBoQ editor, Rate LibraryLibrary rates and build-upsA priced BoQ
8. Check before tenderCheck the BoQ on the BoQ (also run by Issue for Tender)The BoQWhat is typed, missing, twice or far from the library rate
9. TenderIssue for Tender, Tender Analysis, Lock as Contract BoQTenderers' priced BoQsThe Contract BoQ and the contract sum
10. Cost CheckThe cost plan, Cost Check tabThe Contract BoQPlan against BoQ element by element; the plan then counts as a past project for the next estimates

Two ways to start

  • From the drawings: cost plan (if the client asks for an early figure), then a draft contract and an empty BoQ, then the take-off and the schedules fill the BoQ (steps 1 to 10).
  • From a BoQ you already have (an Excel file from another QS, a re-measure): contract, Import from Excel, then price, check, tender (steps 2, 3, 7 to 10). The take-off is not needed.

What goes where, and what never does

  • A measurement on a drawing is in the BoQ only after Send to BoQ. Until then it is on the drawing only; Review lists what is not yet sent.
  • A deduction (an opening) is taken off a BoQ item only; it never makes an item negative and waits when its item does not exist yet.
  • Bar kg go to the BoQ from the schedule; the take-off's kg/m3 items for the same members would count them twice (see Bar Bending Schedules).
  • A locked Contract BoQ changes only through variation orders. A revised drawing becomes a new BoQ revision or a variation order (see Revised drawings).
  • The cost plan reads the BoQ (Cost Check); the BoQ never reads the cost plan.
ExampleA two-room house, 1:50, from estimate to Cost Check
1. Cost plan, scheme stage: floor area 40 m2 and external walls 78 m2 (outside girth 26 m x 3 m) from the scheme drawing; walls at 59,000 a m24,602,000
4. Take-off on the working drawing: external walls on their centre line 25.2 m x 3 m75.6 m2
6. Sent to the BoQ: walling 75.6 less two doors and a window 5.4370.17 m2
5-6. Ring beams: Y12 2 x 4 x 8.2 m x 0.888 kg/m from the schedule58.253 kg
8. Check before tender: nothing typed, nothing twice, no item without quantityclear
10. Cost Check: each element of the plan against its billsBoQ less plan

Tip

Not sure? Start with a contract and a BoQ: everything else hangs on them. The cost plan is for the client's first question, what will it cost, before the drawings are finished.

← PreviousHow HodariQ worksNext →Set up your firm

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • The steps
  • Two ways to start
  • What goes where, and what never does