From the first estimate to the tender
Where to start, what each step takes in and gives out: cost plan, contract, BoQ, take-off, schedules, pricing, checks, tender, Cost Check.
HodariQ follows the order of a QS's work. Each step takes something in and gives something out; nothing is sent backwards. Quantities go one way only: from the drawings, schedules and sheets into the BoQ. The cost plan never feeds the BoQ: it is the estimate the BoQ is checked against at the end.
The steps
| Step | Where | Takes in | Gives out |
|---|---|---|---|
| 1. Cost plan (optional) | Estimating › Cost Plans | Floor area, building type, region; costs of past projects, library rates or quantities from a scheme drawing | The estimate for the client, per element and per m2. Nothing goes to the BoQ. |
| 2. Contract | Contracts › Contracts | Parties, dates, terms | The place every document of the job belongs to. A draft contract is enough to start measuring. |
| 3. BoQ | Estimating › Bills of Quantities | Nothing yet: it can start empty, or be imported from Excel | The bills and items the quantities go into |
| 4. Drawings & Take-off | Estimating › Drawings & Take-off | The PDF drawings and their scale | Measurements: rooms, walls, openings, assemblies (see Take-off) |
| 5. Bar Bending Schedules | Estimating › Bar Bending Schedules | Bars by member, size and shape | kg of each bar size |
| 6. Into the BoQ | By BoQ item › Create the BoQ items › Send to BoQ (drawing); Send to BoQ (schedule) | The measurements and the kg | BoQ items with their measurement rows; every quantity explained back to its drawing or schedule |
| 7. Price | BoQ editor, Rate Library | Library rates and build-ups | A priced BoQ |
| 8. Check before tender | Check the BoQ on the BoQ (also run by Issue for Tender) | The BoQ | What is typed, missing, twice or far from the library rate |
| 9. Tender | Issue for Tender, Tender Analysis, Lock as Contract BoQ | Tenderers' priced BoQs | The Contract BoQ and the contract sum |
| 10. Cost Check | The cost plan, Cost Check tab | The Contract BoQ | Plan against BoQ element by element; the plan then counts as a past project for the next estimates |
Two ways to start
- From the drawings: cost plan (if the client asks for an early figure), then a draft contract and an empty BoQ, then the take-off and the schedules fill the BoQ (steps 1 to 10).
- From a BoQ you already have (an Excel file from another QS, a re-measure): contract, Import from Excel, then price, check, tender (steps 2, 3, 7 to 10). The take-off is not needed.
What goes where, and what never does
- A measurement on a drawing is in the BoQ only after Send to BoQ. Until then it is on the drawing only; Review lists what is not yet sent.
- A deduction (an opening) is taken off a BoQ item only; it never makes an item negative and waits when its item does not exist yet.
- Bar kg go to the BoQ from the schedule; the take-off's kg/m3 items for the same members would count them twice (see Bar Bending Schedules).
- A locked Contract BoQ changes only through variation orders. A revised drawing becomes a new BoQ revision or a variation order (see Revised drawings).
- The cost plan reads the BoQ (Cost Check); the BoQ never reads the cost plan.
1. Cost plan, scheme stage: floor area 40 m2 and external walls 78 m2 (outside girth 26 m x 3 m) from the scheme drawing; walls at 59,000 a m24,602,000
4. Take-off on the working drawing: external walls on their centre line 25.2 m x 3 m75.6 m2
6. Sent to the BoQ: walling 75.6 less two doors and a window 5.4370.17 m2
5-6. Ring beams: Y12 2 x 4 x 8.2 m x 0.888 kg/m from the schedule58.253 kg
8. Check before tender: nothing typed, nothing twice, no item without quantityclear
10. Cost Check: each element of the plan against its billsBoQ less plan
Tip
Not sure? Start with a contract and a BoQ: everything else hangs on them. The cost plan is for the client's first question, what will it cost, before the drawings are finished.
Something unclear? Ask us on WhatsApp: we answer the same day.