HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • From the first estimate to the tender
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • Add-on modules
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor: the firm and each contract

Bills of Quantities

  • Checking an Excel BoQ
  • Build a BoQ
  • BoQ templates
  • BoQ assemblies
  • Import quantities
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Explain a quantity
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Check before tender
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Drawing sets: Start from Drawings
  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Measure the plan
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Quantity Register
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure
  • Bar Bending Schedules

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Plant and Equipment

  • The machine register
  • Import machines from Excel
  • Daily log
  • Charge machines to our contracts
  • Fuel
  • Hiring machines out
  • Service and repairs
  • Plant profit and alerts
  • Plant from the site phone

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Bills of Quantities

Checking an Excel BoQ

Every error of an Excel BoQ's own arithmetic, found as it is read: items, page totals, the summary, its percentages. Kept with the BoQ until each is looked at.

A BoQ prepared in Excel carries its own arithmetic: quantity times rate on each item, a SUM at the foot of each page, a collection, a summary of the bills, then contingency, VAT and fees. One wrong cell range in a SUM, one total typed over a formula, and the figure sent to the client is wrong by millions with nothing on the screen to show it. HodariQ reads the workbook the way a checking QS would and lists every such error with its sheet and row.

Check a file without importing it

  1. 1Open Estimating › Check an Excel BoQ.
  2. 2Choose the Excel file (.xlsx or .xls) and press Read File.
  3. 3The columns are found by their titles (Item, Description, Unit, Qty, Rate, Amount). When they are not, set the column letters and press Preview.
  4. 4The tab Errors in the Excel opens first. Its headline says how many errors and how many things to look at; red rows are errors, yellow rows may be right.
  5. 5Press Print the Errors for a PDF to send to whoever prepared the BoQ.

Nothing is imported from this menu: it only checks. To bring the BoQ in, open the BoQ and press Import from Excel; the same check runs there, before Import.

What is checked

CheckRuleShown as
Item arithmeticQty x Rate differs from the Amount written by more than 1 shilling.Error: Excel says / Should be / Difference.
Page totalsA row such as TO COLLECTION, Carried to collection, Page total: its figure against the sum of the items above it on that page.Error, with the row of the total (look at its SUM formula).
Summary against the billsEach line of a Summary sheet (or the summary under the bills of a sheet) is matched to the bill of that name (FRAMES fits FRAME, DECORATIONS fits PAINTING AND DECORATING) or, in a workbook of several buildings, to a sheet's name; its figure against the bill's total as its items add up.Error when they differ.
Summary totalsA TOTAL or SUB TOTAL row against the lines above it (and the total before it).Error.
PercentagesA row such as ADD: CONTINGENCY 10% or ADD: VAT 18%: the percent of the total above it. LESS rows are taken off.Error.
Only in the summaryA line of the summary with no bill of that name in the workbook (a provisional sum given only there, a bill kept in another file).To look at, with its amount.
Not in the summaryA bill read from the sheets that the summary does not list: its total is left out of the summary's total.To look at.
LinesA reference used twice in a bill, an item without a unit, a quantity that is not a number, quantity and unit in each other's column.To look at.

How the workbook is read

  • A bill starts at a row such as BILL No. 2 - SUBSTRUCTURE or ELEMENT NR. 2 - FRAME. Figures written to the right of the BoQ's columns (a QS's timesing, length, width beside the item) are side calculations: they never stop such a row from starting a bill, and a row holding only them is not a line.
  • With Read every sheet, each visible sheet is read; sheets named Summary, Collection, Cover or Contents are read as summaries, not bills. A sheet with its own column titles in other places (a schedule of materials: QTY | UNIT | DESCRIPTION | UNIT PRICE) is left out and named in the message.
  • A workbook of several buildings (a main block, a water tower, external works) starts its bills at 1 on every sheet. A bill number already used on another sheet gets the next free number and the sheet's name in its title ("WATER TOWER - SUBSTRUCTURE"), so two buildings never end up in one bill.
  • Dashes and signs a file's encoding lost around a bill's title ("ELEMENT NR. 2 � FRAME.") are taken off: the bill is FRAME.

A worked example

ExampleThe summary of a commercial building
Bills read: Electrical installation (items)142,372,400
Summary line ELECTRICAL INSTALLATION290,154,300
Error on the summary line (Excel says less should be)147,781,900
Cause, shown on the ELECTRICAL sheet row 57SUM(F25:F56) counts rows 25 to 36 twice
TOTAL OF MEASURED WORKS written3,504,766,700
Lines of the summary added up3,646,479,400
Total written short by (the preliminaries left out)-141,712,700

When the BoQ is imported

HodariQ imports quantities and rates and works the amounts out itself (quantity x rate), so the BoQ in the system is right where the Excel's arithmetic was wrong; its total then differs from the Excel's. The errors stay with the BoQ: the tab Excel errors of the BoQ (button More) lists them, and the BoQ screen shows a red Excel: n errors button while any is open.

  • Check and Issue for Tender list them first, as Excel file findings: put each right, or ignore it once looked at.
  • Lock as Contract BoQ is refused while one is open: the client must never be sent a contract sum that differs from the Excel nobody looked at.
  • Importing again replaces the errors of the earlier file.

Check your BoQ on the website

The same check is open to anyone on the HodariQ website (Check your BoQ): a visitor uploads an Excel BoQ and sees its errors. During HodariQ's testing period the files checked there are kept by HodariQ, to improve the check; the page says so. Up to 4 MB, Excel files only, ten checks an hour from one connection.

Good to know

The check reads what the file holds: it cannot know that a rate is too low, only that the arithmetic around it is wrong. Values only: a workbook saved without its calculated values (from some converters) shows its formulas as empty; open it in Excel and save it again.

← PreviousConsultant or contractor: the firm and each contractNext →Build a BoQ

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Check a file without importing it
  • What is checked
  • How the workbook is read
  • A worked example
  • When the BoQ is imported
  • Check your BoQ on the website