HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • From the first estimate to the tender
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • Add-on modules
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor: the firm and each contract

Bills of Quantities

  • Checking an Excel BoQ
  • Build a BoQ
  • BoQ templates
  • BoQ assemblies
  • Import quantities
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Explain a quantity
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Check before tender
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Drawing sets: Start from Drawings
  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Measure the plan
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Quantity Register
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure
  • Bar Bending Schedules

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Plant and Equipment

  • The machine register
  • Import machines from Excel
  • Daily log
  • Charge machines to our contracts
  • Fuel
  • Hiring machines out
  • Service and repairs
  • Plant profit and alerts
  • Plant from the site phone

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Money

Cost plans

The elemental estimate before there is a BoQ: costs of past projects, build-ups from the library, quantities from the drawing, stages compared, then checked against the BoQ.

Before there is a Bill of Quantities, the client asks what the building will cost. A cost plan prices it element by element (substructure, frame, roof...), adds preliminaries, contingency and VAT, and gives the cost per m2 of floor area. It stands on its own: no contract is needed. Once the project becomes a contract, the plan is checked against the Contract BoQ.

A cost plan never sends anything to the BoQ. The BoQ is measured (take-off, schedules, sheets) and priced on its own; the cost plan is the estimate it is checked against. A checked plan becomes, in turn, a past project that gives costs to the next cost plans of the same building type.

Make a cost plan

  1. 1Go to Estimating › Cost Plans and press New.
  2. 2Type the Project, and choose the Client. Fill Location, Building type (from the list in Configuration › Building Types), Price region (your home region unless it is built elsewhere), Stage (Concept / feasibility, Scheme design or Detailed design), Date, Gross floor area (m2) and Storeys.
  3. 3On Elements, the usual 18 elements are already listed, each priced per m2 of floor area: Substructure, Frame, Upper floors, Roof, Stairs, External walls, Windows and external doors, Internal walls and partitions, Internal doors, Wall, Floor and Ceiling finishes, Fittings and furnishings, Sanitary appliances and plumbing, Electrical installations, Mechanical installations, Fire protection, External works and drainage.
  4. 4Price each element: press Use Past Costs when past projects of the type are found, type a Rate, or open the element (the list button at the end of its row) to build its rate from the library or take its quantity from the drawing. Delete the elements the building does not have, add others, and add a Description of what is allowed for.
  5. 5Check Preliminaries (10%), Contingency (5%) and VAT (the firm's rate) under the elements, and write the Assumptions (prices at today's rates, exclusions such as land, fees and furniture).
  6. 6Press Print Cost Plan, then Issue to Client.

How it is worked out

PricedAmount
Per m2 of floor areaGross floor area x rate. The quantity follows the floor area when it changes.
Quantity x rateThe element quantity (typed, or from the drawing), with its unit, x rate. It stays when the floor area changes.
Lump sumThe rate is the sum.
  • Building works = the sum of the elements. Each element shows its Per m2 GFA and its % of works.
  • Preliminaries = % of the building works; contingency = % of building works plus preliminaries.
  • Total (excl. VAT) = works + preliminaries + contingency; VAT = % of that total; Cost per m2 = total excl. VAT / gross floor area.
ExampleOffice block, 1,000 m2
Substructure 60,000 a m2 x 1,00060,000,000
Frame 90,000 a m2 x 1,00090,000,000
External works 500 m2 x 40,00020,000,000
Building works170,000,000
Preliminaries 10%17,000,000
Contingency 5% of 187,000,0009,350,000
Total (excl. VAT)196,350,000
VAT 18%35,343,000
Cost per m2196,350
Total (incl. VAT)231,693,000

If the floor area grows to 1,200 m2, the substructure becomes 72,000,000 while the external works stay 20,000,000.

Costs from past projects

The hardest figure of a cost plan is the rate per m2 of each element. HodariQ takes it from your own finished projects: what each element really cost in their BoQ, per m2 of their floor area, brought to the date and the region of the new plan. Nothing is guessed: every figure comes from a BoQ you priced, and the Past Projects tab lists each project and how it was brought to today.

A plan counts as a past project when all of these are true:

  • It has the same Building type as the new plan, in the same company.
  • Its Contract has a Contract BoQ (a locked BoQ), and at least one of its elements has its bills matched on the Cost Check.
  • It has a Gross floor area.
  • It is not of the new plan's own contract (that BoQ is the Cost Check of the new plan, not a past project).
  • One plan per contract counts: the latest by date. The earlier stages of the same project are not counted again.

For each element of the new plan, each past project with an element of the same name (any case) whose bills are matched gives one figure:

StepFigure
Cost per m2 thenTotal of the element's bills in the past BoQ / past gross floor area
Brought to the datex index on the new plan's date / index on the date of the past prices. The date of the past prices is the contract's Tender date, else its Contract date, else the past plan's date.
Brought to the regionx (1 + factor of the new plan's region) / (1 + factor of the past plan's region), with the factor of each region for every type (Price Regions, a factor with no type and no category). The home region and a region without such a factor count 0%.
Past low / middle / highThe lowest, the median and the highest of the figures. With an even number of projects the middle is the average of the two in the middle.
ProjectsHow many figures were found for the element (optional column).

Use Past Costs fills the rate of every element that is priced per m2, has no rate (0), has no build-up and has a past cost, with its Past middle. Typed rates are never touched; clear a rate to take the past cost again. An element priced by quantity or as a lump sum is never filled: a cost per m2 of floor area does not fit it.

ExampleNew office block, Dar es Salaam, June 2026: Substructure
Cost Index: 100.0 from 1 January 2025, 110.0 from 1 January 2026
A: 60,000,000 / 1,000 m2 = 60,000; prices of June 2025: x 110 / 10066,000
B: 35,000,000 / 500 m2 = 70,000; June 2025: x 110 / 10077,000
C, Mwanza (+10% for every type): 66,000,000 / 800 m2 = 82,500; March 2026: x 110 / 110 / 1.1075,000
Past low / high66,000 / 77,000
Past middle (the rate Use Past Costs takes)75,000

The same plan set in Mwanza moves every figure by +10%: A 72,600, B 84,700, C 82,500, middle 82,500. A region factor for one type only (labour -20%) is not used: an element mixes every type.

Good to know

No past project yet? A plan counts once its contract's BoQ is locked and its bills are matched. For finished jobs made before HodariQ, make one plan per job with its floor area and building type, pick its contract and press Match the Bills: it counts from then on, without pricing its elements.

The Cost Index

Configuration › Cost Index (Senior QS / Manager) holds one figure per date: a published building cost index or your own. The index on a date is the figure of the latest date on or before it. When either date has no figure before it, the cost is used as it was and How says *no index*.

ExampleIndex figures 100.0 (1 Jan 2025) and 104.5 (1 Jul 2025)
Index on 31 December 2024none
Index on 1 March 2025100.0
Index on 1 January 2026104.5
A cost of March 2025 in January 2026x 1.045

Build-up from the rate library

An element's rate can be made of library rates: each rate times how much of it one unit of the element holds. Open the element (the list button at the end of its row) and add lines under Build-up from the rate library: the Library rate, and Per unit of the element. The element's Rate is then the total of the lines and cannot be typed.

ExampleExternal walls, per m2 of wall, 600 m2
200 mm block walling 32,000 x 132,000
Plaster 15 mm 9,000 x 2 (both sides)18,000
Emulsion paint 4,500 x 29,000
Rate per m2 of wall59,000
600 m2 x 59,00035,400,000
  • The rate of each line is copied from the library when the rate is picked. A later change of the library does not move an estimate already given; Library Rates in the element takes today's rates again (the plaster at 10,000 makes the rate 61,000).
  • The rate of a line can be typed over (a special price for this job).
  • A copy of the plan (and Next Stage) keeps the build-ups with their rates. An issued plan refuses any change to them.

Quantities from the drawing

With the take-off (the add-on HodariQ Take-off), a plan whose Contract has drawings takes its quantities from them, before there is a BoQ. Put the scheme drawings on a draft contract to measure them.

  • Floor area from drawing (beside the floor area): area measurements of the contract's drawings. The Gross floor area is their total and cannot be typed. Measure the outside of each floor; a void measured as a deduction counts less.
  • From drawing in an element: measurements of any kind of the contract's drawings. The element becomes priced by quantity, in their unit, and its quantity is their total (each measurement with its height and times; a deduction counts less).
  • All the measurements of one element are of one unit: m2 of wall and a number of windows are refused together.
  • While the plan is a draft its quantities follow the drawing: a wall height changed on the drawing changes the plan. An issued plan keeps the figures it was issued with.
  • When picked on a cost plan, a measurement shows its figure and drawing, e.g. External walls: 156.00 m2 (A-101 Scheme plan).
ExampleA house of two floors, 8 x 5 m outside, walls 3 m high
Ground floor outside 8 x 540.00 m2
First floor outside 8 x 540.00 m2
Less stair void 2 x 1.5 (deduction)-3.00 m2
Gross floor area77.00 m2
External walls: girth 26 m x 3 m x 2 floors156.00 m2
External walls at 59,000 a m29,204,000

Stages and options

  • Next Stage copies the plan to the next design stage (Concept › Scheme › Detailed) with the same name, today's date and every element, and sets Compare with on the copy to the plan it came from. Detailed design has no next stage.
  • Compare with (on the Compare tab) is any other plan: the previous stage, or another option of the same project (copy a plan, change it, compare the two).
  • The Compare tab shows each element in this plan, in the other plan (the element of the same name) and the Change; and the totals with This plan less the other (red when this plan is dearer).
ExampleConcept to scheme: the substructure better known
Substructure 60,000 to 66,000 a m2 x 1,000+6,000,000
Preliminaries 10%+600,000
Contingency 5% of 6,600,000+330,000
This plan less the other+6,930,000

Issue, change, copy

  • Issue to Client needs a priced plan (a total above 0). An issued plan is locked; to change it press Back to Draft, or copy it for a new estimate: the copy is a draft with a new reference and all the elements.
  • On an issued plan only these still change: the contract, the matching of the bills (Cost Check), the building type, the price region, Compare with and the assumptions. Its figures never.
  • Each plan has its own reference, CP-year-three digits.
  • The print-out shows the project, client, location, building type, design stage, floor area and storeys, the elements with quantity, rate, amount and per m2, the estimated cost excluding and including VAT, the assumptions and exclusions, and Prepared by (Quantity Surveyor). A plan not yet issued is marked DRAFT.

Cost Check against the BoQ

On the Cost Check tab pick the Contract (also on an issued plan). Its Contract BoQ total appears beside the plan total with BoQ less plan (red when the BoQ is above the plan). Then press Match the Bills: each bill goes to the element its name points to. Each element shows its BoQ amount, the difference and Over % (the difference in % of the element in the plan, red above 5%).

How Match the Bills decides, for each bill not yet on an element:

  • A bill of preliminaries, provisional sums, dayworks, contingencies, prime cost sums or the general summary is never matched: in the plan they are the preliminaries and contingency percentages.
  • The bill fits an element when one of the element's words is found in the bill name, each word beginning a word of the name (roof fits Roofing, foundation fits Foundations). The words of the usual elements are in the table below; an element of another name is found by its own words (and, the, of, works left out).
  • Only elements without bills yet can take a bill. When a bill fits two elements, the one whose word is the first word of the bill wins (Sanitary fittings goes to Sanitary appliances and plumbing, not to Fittings and furnishings). Still two, or none: the bill is left for you.
  • The message lists what went where, and the bills left (fit more than one element, or none). Pick those yourself in Priced in BoQ bills.
  • A bill counts on one element only: putting it on a second element is refused, so nothing is counted twice.
  • Pressing it again changes nothing already matched.
ElementA bill name with
Substructuresubstructure, foundation
Frameframe, structural
Upper floorsupper floor, suspended slab
Roofroof
Stairsstair
External wallsexternal wall
Windows and external doorswindow, external door
Internal walls and partitionsinternal wall, partition
Internal doorsinternal door
Wall finisheswall finish
Floor finishesfloor finish
Ceiling finishesceiling
Fittings and furnishingsfitting, furnish
Sanitary appliances and plumbingplumbing, sanitary, water supply
Electrical installationselectrical
Mechanical installationsmechanical, air condition, ventilation, lift
Fire protectionfire
External works and drainageexternal work, drainage, site work, landscap(ing)

The bills on no element are listed under Bills not matched with their total, and Not matched shows the amount beside the BoQ total: bills matched + not matched = the Contract BoQ. BoQ per m2 (the bills matched / floor area) is what the plan gives as a past project.

ExampleContract BoQ of 201,000,000, plan of 1,000 m2
Substructure to Substructure; Roofing to Roofmatched
Doors and windows to Windows and external doorsmatched
Sanitary fittings to Sanitary appliances and plumbingmatched
Electrical installation to Electrical installationsmatched
Bills matched112,000,000
Preliminaries, Provisional and PC Sums (not works), Concrete work and Finishings (no single element): not matched89,000,000
BoQ per m2 (112,000,000 / 1,000)112,000
Substructure: BoQ 60,000,000 against plan 50,000 x 1,000+10,000,000 (Over 20.0%)

Concrete work can then be put on the Frame by hand; putting it also on Upper floors is refused.

Good to know

Cost plans come with the Cost Plans feature (Settings › Features, Professional plan), with Configuration › Building Types and Cost Index. QS Officers and Senior QS / Managers make and issue them; Directors read them. Building types and the index are kept by a Senior QS / Manager. Quantities from the drawing need the take-off add-on.

← PreviousSubcontractor certificatesNext →Add your site team

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Make a cost plan
  • How it is worked out
  • Costs from past projects
  • The Cost Index
  • Build-up from the rate library
  • Quantities from the drawing
  • Stages and options
  • Issue, change, copy
  • Cost Check against the BoQ