BoQ templates
A new BoQ started with the usual bills and items of its kind of project: HodariQ's standard templates and the firm's own, the few questions asked, how rates are filled, and how HodariQ learns what the firm removes.
Most QS firms start a BoQ by opening an old one and deleting what the new project does not need. A template is that old BoQ, clean: the usual bills and items of a kind of project, worded as Tanzanian BoQs word them, with every quantity empty.
Start from a template
- 1Open the empty BoQ and choose From a template (or More > Start from a template on a BoQ that has bills already: the template's bills are added after them).
- 2Choose the kind of project (Buildings, Roads, Other civil works) and the template. The firm's last choice is proposed.
- 3Check the region, the number of storeys and the contract period (taken from the contract), and the gross floor area if you know it.
- 4Press Start the BoQ. Then measure: type the quantities, import them from a take-off file, add work from an assembly, or send them from the take-off.
- 5When everything is measured, Without quantity (top bar) removes the items the project did not need.
What each answer changes
| Question | Changes |
|---|---|
| Template | The bills and items |
| Region | Which library rate is filled when the library has the same item for several regions |
| Storeys | 1: no scaffolding to upper floors, no plaster to soffits of slabs or sides of beams. 4 or more: the lift, its profit and attendance, the lift shaft walls. |
| Contract period (weeks) | The quantity of the preliminaries priced by the week (site agent, foreman) or by the month (Engineer's office, vehicle) = weeks / 4.33 |
| Gross floor area | Nothing in the BoQ: it gives the cost per m2 on the top bar. It is never used as a quantity. |
Rates: filled only for the same item
- A rate is filled only when the firm's library has the very same description and unit (the region of the BoQ first, then a library rate without region), or when the firm's past BoQs priced the very same description and unit (their median rate).
- A description that is only close fills nothing. Every other rate stays empty, to be priced.
- Untick Fill the rates I have to start with every rate empty.
- Lump sums (provisional sums, PC sums, contingency) come with a quantity of 1; % additions are linked to the PC sum above them.
HodariQ's standard templates
| Template | Kind | Bills |
|---|---|---|
| House or small building, one storey | Buildings | Preliminaries, Substructure, Walling and concrete (ring beam, lintels), Roofing (trusses, sheets), Doors, Windows, Finishings, Painting, Plumbing and drainage (septic tank, soak away), Electrical, PC and provisional sums |
| Multi-storey building, RC frame | Buildings | As above with Frame, Staircase, flat or pitched roof, Fire fighting and safety, Lift (4 storeys or more) |
| Warehouse or factory, steel portal frame | Buildings | Pad foundations and industrial floor slab, Structural steelwork, Roofing and cladding, Walling, roller shutter doors, high bay lighting |
| Boundary wall and gates | Other civil works | Foundations, columns, block wall, render and paint, razor wire or electric fence, gates, guard house |
| External works and parking | Other civil works | Earthworks, base course, paving blocks, kerbs, storm water drains, landscaping, compound lighting |
| Gravel road | Roads | General items (establishment, Engineer's facilities, traffic, environment and HIV/AIDS awareness), site clearance, earthworks, drainage and culverts, gravel wearing course, signs |
| Paved road | Roads | As the gravel road with subbase, base, prime coat, DBST or asphalt, markings, guardrails, kerbs, walkways, street lighting |
| Water supply pipeline and storage tank | Other civil works | Trenching, pipes, fittings, valves and chambers, thrust blocks, tank and tower, testing |
Good to know
The road templates use the usual headings of road works; their series numbers and specification references are those of the project's specification: check them against it.
The firm's own templates
- More > Save as a template on any BoQ: its bills and lines, without quantities, become a template of the firm. Tick Keep the rates to keep its rates; otherwise the library fills them when a BoQ is started from it. Replace our template updates an existing one.
- Configuration > BoQ Templates: every template, how many lines it has and how many BoQs were started from it. A standard template of HodariQ cannot be changed: Duplicate it to make the firm's own, then change its bills and lines.
HodariQ learns what the firm removes
Every line started from a template remembers the template line it came from. When the firm has issued (for tender or as the Contract BoQ) at least three BoQs started from a template, a template line it removed from 80% of them or more is left out of the next BoQ started from that template. The window says how many lines are left out; untick Leave out what we usually remove to have them all.
Nothing is guessed: it is a count of what the firm itself did, in its own database. One firm's choices never reach another firm.
Something unclear? Ask us on WhatsApp: we answer the same day.