HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • From the first estimate to the tender
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • Add-on modules
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor: the firm and each contract

Bills of Quantities

  • Checking an Excel BoQ
  • Build a BoQ
  • BoQ templates
  • BoQ assemblies
  • Import quantities
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Explain a quantity
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Check before tender
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Drawing sets: Start from Drawings
  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Measure the plan
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Quantity Register
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure
  • Bar Bending Schedules

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Plant and Equipment

  • The machine register
  • Import machines from Excel
  • Daily log
  • Charge machines to our contracts
  • Fuel
  • Hiring machines out
  • Service and repairs
  • Plant profit and alerts
  • Plant from the site phone

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Bills of Quantities

BoQ templates

A new BoQ started with the usual bills and items of its kind of project: HodariQ's standard templates and the firm's own, the few questions asked, how rates are filled, and how HodariQ learns what the firm removes.

Most QS firms start a BoQ by opening an old one and deleting what the new project does not need. A template is that old BoQ, clean: the usual bills and items of a kind of project, worded as Tanzanian BoQs word them, with every quantity empty.

Start from a template

  1. 1Open the empty BoQ and choose From a template (or More > Start from a template on a BoQ that has bills already: the template's bills are added after them).
  2. 2Choose the kind of project (Buildings, Roads, Other civil works) and the template. The firm's last choice is proposed.
  3. 3Check the region, the number of storeys and the contract period (taken from the contract), and the gross floor area if you know it.
  4. 4Press Start the BoQ. Then measure: type the quantities, import them from a take-off file, add work from an assembly, or send them from the take-off.
  5. 5When everything is measured, Without quantity (top bar) removes the items the project did not need.

What each answer changes

QuestionChanges
TemplateThe bills and items
RegionWhich library rate is filled when the library has the same item for several regions
Storeys1: no scaffolding to upper floors, no plaster to soffits of slabs or sides of beams. 4 or more: the lift, its profit and attendance, the lift shaft walls.
Contract period (weeks)The quantity of the preliminaries priced by the week (site agent, foreman) or by the month (Engineer's office, vehicle) = weeks / 4.33
Gross floor areaNothing in the BoQ: it gives the cost per m2 on the top bar. It is never used as a quantity.

Rates: filled only for the same item

  • A rate is filled only when the firm's library has the very same description and unit (the region of the BoQ first, then a library rate without region), or when the firm's past BoQs priced the very same description and unit (their median rate).
  • A description that is only close fills nothing. Every other rate stays empty, to be priced.
  • Untick Fill the rates I have to start with every rate empty.
  • Lump sums (provisional sums, PC sums, contingency) come with a quantity of 1; % additions are linked to the PC sum above them.

HodariQ's standard templates

TemplateKindBills
House or small building, one storeyBuildingsPreliminaries, Substructure, Walling and concrete (ring beam, lintels), Roofing (trusses, sheets), Doors, Windows, Finishings, Painting, Plumbing and drainage (septic tank, soak away), Electrical, PC and provisional sums
Multi-storey building, RC frameBuildingsAs above with Frame, Staircase, flat or pitched roof, Fire fighting and safety, Lift (4 storeys or more)
Warehouse or factory, steel portal frameBuildingsPad foundations and industrial floor slab, Structural steelwork, Roofing and cladding, Walling, roller shutter doors, high bay lighting
Boundary wall and gatesOther civil worksFoundations, columns, block wall, render and paint, razor wire or electric fence, gates, guard house
External works and parkingOther civil worksEarthworks, base course, paving blocks, kerbs, storm water drains, landscaping, compound lighting
Gravel roadRoadsGeneral items (establishment, Engineer's facilities, traffic, environment and HIV/AIDS awareness), site clearance, earthworks, drainage and culverts, gravel wearing course, signs
Paved roadRoadsAs the gravel road with subbase, base, prime coat, DBST or asphalt, markings, guardrails, kerbs, walkways, street lighting
Water supply pipeline and storage tankOther civil worksTrenching, pipes, fittings, valves and chambers, thrust blocks, tank and tower, testing

Good to know

The road templates use the usual headings of road works; their series numbers and specification references are those of the project's specification: check them against it.

The firm's own templates

  • More > Save as a template on any BoQ: its bills and lines, without quantities, become a template of the firm. Tick Keep the rates to keep its rates; otherwise the library fills them when a BoQ is started from it. Replace our template updates an existing one.
  • Configuration > BoQ Templates: every template, how many lines it has and how many BoQs were started from it. A standard template of HodariQ cannot be changed: Duplicate it to make the firm's own, then change its bills and lines.

HodariQ learns what the firm removes

Every line started from a template remembers the template line it came from. When the firm has issued (for tender or as the Contract BoQ) at least three BoQs started from a template, a template line it removed from 80% of them or more is left out of the next BoQ started from that template. The window says how many lines are left out; untick Leave out what we usually remove to have them all.

ExampleThe trench item removed from three BoQs out of three
BoQs started from the template and issued3
BoQs that kept the item0
Share removed100% (80% or more)
Next BoQ from this templateleft out

Nothing is guessed: it is a count of what the firm itself did, in its own database. One firm's choices never reach another firm.

← PreviousBuild a BoQNext →BoQ assemblies

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Start from a template
  • What each answer changes
  • Rates: filled only for the same item
  • HodariQ's standard templates
  • The firm's own templates
  • HodariQ learns what the firm removes