HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • From the first estimate to the tender
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • Add-on modules
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor: the firm and each contract

Bills of Quantities

  • Checking an Excel BoQ
  • Build a BoQ
  • BoQ templates
  • BoQ assemblies
  • Import quantities
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Explain a quantity
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Check before tender
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Drawing sets: Start from Drawings
  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Measure the plan
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Quantity Register
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure
  • Bar Bending Schedules

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Plant and Equipment

  • The machine register
  • Import machines from Excel
  • Daily log
  • Charge machines to our contracts
  • Fuel
  • Hiring machines out
  • Service and repairs
  • Plant profit and alerts
  • Plant from the site phone

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Bills of Quantities

Check before tender

Only what looks wrong, listed before a BoQ is issued: no quantity, typed quantities, the same item twice, rates far from the library, missing work. Put right or ignored.

Issue for Tender checks the BoQ first. When nothing looks wrong it is issued at once. Otherwise Check the BoQ opens with the findings only, not the whole BoQ: each one is put right in the BoQ, or ignored. The same check is under Check in the BoQ editor and Check the BoQ on the BoQ, at any time while it is Draft or Tender.

What is checked

CheckListed whenOn
No quantityA measured item has no quantity.Measured items
Typed quantityA measured item has a quantity with no measurement behind it (no row on its sheet, no drawing, no Quick Measure).Measured items
No unitA priced line other than a sum has no unit.Items, prelims, dayworks
TwiceTwo measured items of the same bill have the same description and unit; the second is listed.Measured items
No rateA line has a quantity and no rate. Only when the BoQ has rates at all: a BoQ sent out for pricing is unpriced on purpose.Priced BoQs
RateA rate taken from the Rate Library is more than the set % above or below that library rate (20% unless changed).Lines with a library rate
Missing workAn item says words that need other work, and no item of the BoQ has that work (below).The whole BoQ

Missing work: the firm's checks

Configuration › BoQ Checks (Senior QS / Manager) holds the checks of work that comes with other work. A check has the words that start it, words that leave an item out, and the words the BoQ must also have. Words are separated by commas and match the start of a word: excavat matches excavation. Add, change or switch off any.

Check (as supplied)When an item saysNot when it saysThe BoQ must have
Concrete needs formworkreinforced concrete, in situ concreteprecast, blinding, mass concreteformwork, shuttering
Reinforced concrete needs reinforcementreinforced concretereinforcement, rebar, bars, high yield, mild steel, fabric, BRC, mesh
Walling needs a finishblockwork, brickwork, wallingretaining, fair face, fence, boundaryplaster, render, pointing, fair face
Plaster needs decorationplasterpaint, emulsion, decoration, skim, wash, coat
Excavation needs disposal or fillingexcavatdisposal, cart away, remove, backfill, filling
Roof covering needs a ridgeroofing sheet, iron sheet, roof tileridge

Ignore, or issue

  • Open goes to the item's bill in the BoQ editor, the item marked, to put it right; Check Again reads the BoQ again.
  • Ignore keeps a finding ignored for this BoQ, also in later checks; Ignored: undo brings it back. A changed rate is a new finding.
  • Issue for Tender shows when nothing is left; while findings are open the button is Ignore the Rest and Issue for Tender, and those findings are marked ignored.
  • The % for rates is in Configuration › Settings, BoQ Checks, Rate against the library; 0 switches the rate check off.

Good to know

Every finding is a plain rule written in its message: nothing is guessed, and nothing stops a QS who has decided. The check only makes sure the decision was looked at.

← PreviousExport to ExcelNext →Tender, lock and revise

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • What is checked
  • Missing work: the firm's checks
  • Ignore, or issue