HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • From the first estimate to the tender
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • Add-on modules
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor: the firm and each contract

Bills of Quantities

  • Checking an Excel BoQ
  • Build a BoQ
  • BoQ templates
  • BoQ assemblies
  • Import quantities
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Explain a quantity
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Check before tender
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Drawing sets: Start from Drawings
  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Measure the plan
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Quantity Register
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure
  • Bar Bending Schedules

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Plant and Equipment

  • The machine register
  • Import machines from Excel
  • Daily log
  • Charge machines to our contracts
  • Fuel
  • Hiring machines out
  • Service and repairs
  • Plant profit and alerts
  • Plant from the site phone

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Take-off

Check a take-off

Catch a wrong scale, a drawing whose dimensions do not add up, and a careless click, before the quantities go out.

A take-off can be wrong three ways: the scale, the drawing, or the click. HodariQ gives a check for each.

1. The scale

  • Read the pill: green is checked against the dimensions; orange means look again (see The scale).
  • With Dimension click two or three dimensions in different parts of the page, one across and one down. Each should say as written; a warning means the scale, or that part of the drawing, is off by more than 1%.
  • Read the message for Some dimensions are at another scale: a detail at another scale on the same sheet.

2. The drawing

Check Dimensions finds every chain of dimensions on a line whose ends meet, and the overall dimension spanning the same two ends on another line, and adds the chain up. Within 2 mm it shows a tick and as written; otherwise a warning: 2,360 + 3,600 + 2,400 = 8,360, but 8,400 is written. Click a check to have its overall dimension drawn on the plan.

Only the dimensions that agree on the scale most of the page's dimensions show are used, so a misread figure never gives a false alarm. A chain that does not add up is a question for the architect: raise it as a query on the spot.

ExampleA chain under a plan
Parts written2,360 + 3,600 + 2,400
Their sum8,360
Overall written8,400
Result40 mm out: ask the architect

3. The clicks

  • Use Snap on CAD drawings: a snapped corner is exact, a free click is only as good as your hand and the zoom.
  • At 100% one screen pixel is one drawing unit, about 35 mm on site at 1:100; at 400% about 9 mm. Zoom in for corners.
  • Check the figure under each description: = 25.2 x 3 x 3 shows what was multiplied.
  • Click p.1 on a row to see the measurement drawn on the plan; the selected one is drawn thicker.

Rounding

The points are kept to a hundredth of a drawing unit. Each quantity is rounded to 3 decimals (a millimetre for a length, a thousandth of a square or cubic metre for an area or a volume), and so is each row of the measurement sheet. The BoQ item's quantity is the total of its rows, rounded to 3 decimals: the figures on the screen, the dimension sheets and the BoQ are the same.

4. What is left to do: Review

Review lists, for the whole drawing, what is still to do. Click a line to go to its page and select the measurement. Check again reads it again after you have put things right.

LineWhenPut it right
Page n: the scale is written on the drawing but not checkedA page with measurements whose scale is only written.Measure a dimension, then Confirm Scale.
found by Measure the Plan, not checked yetA measurement To check.Look at its outline, then Accept or delete it.
no floor finishA room floor measured with Room, All Rooms or Measure the Plan, with no assembly and no BoQ item.Choose an assembly or a BoQ item.
its opening is not deductedA door or window counted with its size but without the openings assembly; or found by Measure the Plan with no size.Add the openings assembly, or type its width and height.
no BoQ item chosen (the items named)A measurement, or some of its assembly items, with no BoQ item: one line per measurement.Choose the BoQ items.
n chosen but not sentBoQ items chosen, not sent to the measurement sheets.Send to BoQ.

A measurement still To check is listed once, as To check, and not again for its BoQ items. On a revision that makes a variation order nothing is sent, so nothing is listed as not sent.

Before it goes out

  1. 1Open Review: it should say Nothing left to do.
  2. 2Print the marked drawing and look for anything measured twice or missed.
  3. 3Print the dimension sheets and check each Carried to the BoQ against the BoQ.
  4. 4Answer or close every open query, or list them as provisional in the BoQ.

Tip

Send the marked drawing with the dimension sheets to the checking QS: the checker sees where each quantity was measured without opening HodariQ.

← PreviousPrint the take-offNext →Revised drawings

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • 1. The scale
  • 2. The drawing
  • 3. The clicks
  • Rounding
  • 4. What is left to do: Review
  • Before it goes out