Office, Take-off, Contractor, the Site Portal and Equipment are separate modules: what each brings, how one is installed, what the update did for a firm that already used it, and what removing one means.
HodariQ is one core module plus add-on modules that are installed only for the firms that ask for them. The core is what every QS firm uses: contracts, BoQs, tenders, variation orders, extensions of time, valuations and certificates, invoices and payments, bonds, documents, cost plans, the rate library, the contractor portal and the programme. The add-ons are parts that only some firms use. Without an add-on its menus, its switch in Settings › Features, its settings and its buttons are not there at all; the rest of HodariQ works exactly the same.
The add-ons
| Add-on | Module (Apps) | What it brings | Needs |
|---|---|---|---|
| HodariQ Office | hodariq_office | Office › Inbox (the firm's e-mail as work, with rules, templates and the morning e-mail), Office › Bids with bid / no-bid and the NeST scout, Office › Team (each person's open work and deadlines), and the Inbox tab of a contract. | The core |
| HodariQ Take-off | hodariq_takeoff | Estimating › Drawings & Take-off, Configuration › Take-off Assemblies, the Drawings button and tab of a contract, Measure from Drawing on BoQs and variation orders, the take-off print and the From drawing column of the measurement sheets. | The core |
| HodariQ Contractor | hodariq_contractor | Money › Costs & Subcontracts: Budgets, LPOs, Costs, Subcontracts, Subcontractor Certificates, Suppliers and Supplier prices; the Budget button and the Cost Control tab of a contract; the schedule of materials and costing links of a BoQ; the cost and profit figures of the dashboard; the LPO and subcontractor certificate prints, e-mails and WhatsApp; the Cost Control block of the settings. | The core |
| HodariQ Site Portal | hodariq_site | Site › Material Requests, Daily Reports, Chats, Site Team; the site pages at /site on the team's phones; the Site tab of a contract; Make LPO from an approved request; the request checked against the item's budget; the work done item by item on the certificate (Use the site figures) and in the programme; the site evidence of an extension of time; the Site Portal block of the settings. | HodariQ Contractor (installed with it) |
| HodariQ Equipment | hodariq_equipment | Plant: Machines, Daily log, Fuel, Job cards, Hire agreements and Bookings, Charge to contracts, Plant profit, Other costs, Import from Excel; the Machines button of a contract, the machines' papers in the Documents Register, the Plant tile of the dashboard, the plant alerts, the hire agreement and delivery note prints, and the Plant and Equipment block of the settings. With the Site Portal, the Plant page of the site phones (HodariQ Equipment on Site, which joins by itself). | HodariQ Contractor (installed with it) |
All five are in the Professional and Enterprise plans. The plan still decides each feature's switch, as for any feature.
Where they are in Apps
In Apps (administrator, developer mode) the add-ons are the first cards, before every Odoo app: HodariQ Office, HodariQ Take-off, HodariQ Contractor, HodariQ Site Portal, then HodariQ Equipment. A card that says Activate is not installed; one that says Installed is.
Installing one
- 1Log in as the administrator and turn on developer mode (add ?debug=1 to the address, e.g. /odoo?debug=1): Apps is shown only to the administrator, and only in developer mode, so the firm's people never install Odoo apps by mistake. Open Apps.
- 2On the add-on's card press Activate. HodariQ installs it and reloads; nothing already entered changes. Activating HodariQ Site Portal installs HodariQ Contractor too: a material request becomes an LPO and a cost, and is checked against the budget.
- 3Open Configuration › Settings › All settings, under Features, and check that its switch is on: Inbox and Work and Bids and NeST scout for Office, Drawings and Take-off for Take-off, Cost Control and Subcontracts for Contractor, Site Portal for the Site Portal, Plant and Equipment for Equipment.
- 4For the Inbox, connect the firm's mailbox (see Inbox and Work › Connect the mailbox). For the Site Portal, add the site team (see Site Portal › The site team).
Good to know
On a server we look after, installing is done by us when the firm asks; there is no extra charge inside a plan that includes the feature.
Good to know
A consultant QS firm can have HodariQ Contractor installed for the Site Portal and keep Cost Control and Subcontracts switched off: its menus stay hidden. Costs, budgets, LPOs and subcontracts only ever apply to a contract where We act for is the contractor, in a contractor firm.
What the update did for a firm that already used them
Until November 2026 these parts were in the core. The update that made them add-ons looks at each database once and decides for each add-on:
| The firm had | What the update does |
|---|---|
| Records of it (e-mails or bids for Office; drawings for Take-off; costs, LPOs, budgets or subcontracts for Contractor; a site team, requests or reports for the Site Portal), or its switch on in Settings › Features | Installs the add-on in the same update and hands it every record, with its settings, its numbering (LPO/2026/..., MR/2026/...), its e-mail templates and its automatic jobs. Nothing is lost and nothing has to be done. A firm that used the Site Portal gets HodariQ Contractor as well. |
| No records and the switch off | Leaves the add-on uninstalled and removes its menus, screens and automatic jobs. Installing it later starts it empty. |
Settings that moved
- Delivered materials become costs is in the Cost Control block now (it was in the Site Portal block): it covers what is recorded on an LPO at the office as well as what the site confirms.
- Approve LPOs and Large LPOs stay in Approvals, and Remind suppliers of late LPOs in Cost Control: they come with HodariQ Contractor.
- The programme stays in the core. Without the Site Portal it shows what should be done by today and the certified %, and never marks a task behind for want of site reports.
Removing one
To stop using a part, switch its feature off in Settings › Features: its menus go and its records stay, ready for the day it is switched back on. Uninstalling the add-on in Apps is different: it deletes its records for good (e-mails and bids; drawings and their measurements; costs, budgets, LPOs and subcontracts; the site team's requests, reports and chats). Measurement-sheet rows that came from a drawing lose their link to it, so the BoQ quantities would have to be checked again.
Tip
If you are not sure, switch the feature off; never uninstall an add-on a firm has used.
Something unclear? Ask us on WhatsApp: we answer the same day.