HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • From the first estimate to the tender
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • Add-on modules
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor: the firm and each contract

Bills of Quantities

  • Checking an Excel BoQ
  • Build a BoQ
  • BoQ templates
  • BoQ assemblies
  • Import quantities
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Explain a quantity
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Check before tender
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Drawing sets: Start from Drawings
  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Measure the plan
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Quantity Register
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure
  • Bar Bending Schedules

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Plant and Equipment

  • The machine register
  • Import machines from Excel
  • Daily log
  • Charge machines to our contracts
  • Fuel
  • Hiring machines out
  • Service and repairs
  • Plant profit and alerts
  • Plant from the site phone

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Bills of Quantities

Explain a quantity

Where a BoQ quantity comes from: each row behind it, how it is worked out, and for a drawing the page, zone and scale, one click away.

In the BoQ editor a small grey sign before each quantity says where it comes from. Click it to see the rows behind the quantity: the QS signs for every figure, and this is the evidence.

SignThe quantityClick shows
MapMeasured on a drawing (take-off).Each row with its drawing, page, zone, what was measured (area 19.32 m2 off the drawing, x height 3 m, x 2 times, scale 1:50) and Open on drawing.
BarsFrom a Bar Bending Schedule (the kg of one bar size).The schedule and the size, e.g. 86.213 kg of Y16 from BBS 01 Ground floor beams.
CalculatorMade by Quick Measure.Its rows and how each is worked out.
ListFrom rows typed on the measurement sheet.The rows: times x no. x length x width x height.
PencilTyped on the line, with nothing behind it.That it was typed: measure it on a drawing, with Quick Measure or on its sheet.

When rows come from more than one place, the sign shows the first of drawing, bar bending schedule, Quick Measure, sheet. The window lists every row with where it came from, its working, its quantity (deductions in brackets), then the gross, the deductions and the quantity.

ExampleExcavate trench: two trenches and a pit deducted
Measurement sheet: Trenches2 x 40 x 0.6 x 1 = 48
Measurement sheet: Ddt Pit2 x 1.5 x 1 = (3)
Gross48
Less deductions(3)
Quantity45 m3

Good to know

A row typed on a sheet before a take-off or a Quick Measure (Quantity before measuring) shows as Measurement sheet: the quantity that was there first is kept, never lost.

← PreviousMeasurement sheetsNext →Import from Excel