HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • From the first estimate to the tender
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • Add-on modules
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor: the firm and each contract

Bills of Quantities

  • Checking an Excel BoQ
  • Build a BoQ
  • BoQ templates
  • BoQ assemblies
  • Import quantities
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Explain a quantity
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Check before tender
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Drawing sets: Start from Drawings
  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Measure the plan
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Quantity Register
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure
  • Bar Bending Schedules

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Plant and Equipment

  • The machine register
  • Import machines from Excel
  • Daily log
  • Charge machines to our contracts
  • Fuel
  • Hiring machines out
  • Service and repairs
  • Plant profit and alerts
  • Plant from the site phone

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Take-off

Assemblies

One measurement that fills several BoQ items, each by its own formula, kept by the firm as it measures.

A wall measured once gives its walling, its plaster and paint to both sides and its damp proof course. An assembly writes that down once: a list of items, each with a formula of the measurement's figures and the words that find its BoQ item. Put it on a measurement and its items appear under it.

Use one

  1. 1Open a measurement's settings (the chevron).
  2. 2In + Assembly: add its items... choose the assembly. Only assemblies for that kind of measurement (length, area or count) are listed.
  3. 3Its items appear indented under the measurement, each with its formula, quantity and BoQ item. HodariQ chooses the BoQ item of each when it finds one.
  4. 4Check or choose each BoQ item (or press Create the BoQ items), then press Send to BoQ.

The letters of a formula

LetterA lengthAn areaA count (openings)
LIts length (true length, on the centre line when set)Its perimeterN x W, the width of all the openings
ALength x heightIts area (true area up a pitch)N x W x H, the area of all the openings
HThe height typed or from a sectionThe depth typedThe opening's height
W00The opening's width
N11The number counted

A formula is written as on dimension paper: figures, the five letters, + - x / and brackets, e.g. 2 x L x H, L x 0.6 x 0.9, A / 0.9. x and × both multiply and a comma is a decimal point. Nothing else is accepted, so a formula cannot do anything but work out a quantity.

How the quantity is worked out

  • Each item's quantity is its formula of the measurement's figures, times the measurement's × (times), rounded to 3 decimals. It never goes below zero, and a division by zero gives zero.
  • Change the measurement (its points, height, times, scale) and every item follows; rows already sent follow on the measurement sheets.
  • An item's formula can be changed on the screen for this measurement only: type it in the box under the item's name.
  • An item marked as a deduction in the assembly is taken off its BoQ item. If the measurement itself is ticked Deduct, each item's deduction is turned the other way: a deduction of a deduction adds.
ExampleWalling assembly on a wall 35.2 m on its centre line, 3 m high
Block walling, L x H105.600 m2
Plaster to both sides of walls, 2 x L x H211.200 m2
Paint to both sides of walls, 2 x L x H211.200 m2
Damp proof course, L35.200 m

How the BoQ item is found

For each item HodariQ looks at the BoQ items (or the VO's additions) in the same unit, and takes the one whose description holds the most of the item's words: at least two thirds of them, and always the first word (so Blinding under foundations never finds Excavate trench for foundations: they share foundations only). Between two equal ones, the shorter description. The words are the item's Find the BoQ item by words, or its name when that is empty; plurals count as the same word. When nothing matches, the BoQ item is left for you to choose, or made by Create the BoQ items.

The firm's assemblies

Configuration › Take-off Assemblies keeps them. Each has a name, Used on (Length, Area or Count / openings), a note of what to type on the measurement, and its items: Item, Formula, Unit (m, m2, m3 or No), Deduct and Find the BoQ item by. Tick Door and window openings (counts only) to have it applied at once to a door or window mark added with its size.

SuppliedOnItems
Walling, plastered and painted both sidesLengthBlock walling L x H; plaster and paint 2 x L x H; DPC L
Strip foundation on the centre lineLengthExcavation L x 0.6 x 0.9; concrete L x 0.6 x 0.2; walling to DPC L x H
Room: floor, ceiling and skirtingAreaScreed, floor tiles and ceiling A; skirting L
Room: wall plaster and paintLengthPlaster and paint L x H
Door or window opening: deductionsCountWalling N x W x H, plaster and paint 2 x N x W x H, all deducted
Pitched roof coveringAreaRoofing sheets A; purlins A / 0.9

The Tanzanian library

HodariQ comes with 17 assemblies for the work of a Tanzanian building, from the trench to the paving. Each of their items has its BoQ description (as a Tanzanian BoQ writes it, e.g. Hollow concrete block walling, 200 mm thick, in cement and sand (1:4) mortar) and its Bill (Substructure, Concrete work, Walling, Roofing, Doors, Windows, Finishes, External works). The concrete items in kg (reinforcement) use the rates per m3 written in their formula: change them to the engineer's, or schedule the bars with a Bar Bending Schedule.

AssemblyMeasured asIts items
Strip foundation complete: 600 x 200 concrete, trench 900 deepLength (centre line)Excavation L x 0.6 x 0.9; blinding L x 0.6 x 0.05; concrete L x 0.6 x 0.2; foundation walling to DPC L x H; backfill and disposal (what is dug out is put back or carted away, nothing lost); anti-termite L x 0.6
Pad footing 1200 x 1200 x 300, pit 1500 deepCountExcavation N x 1.4 x 1.4 x 1.5; blinding; concrete N x 1.2 x 1.2 x 0.3; formwork N x 4 x 1.2 x 0.3; reinforcement at 80 kg/m3; backfill; disposal
Ground floor slab on hardcore, with DPM and meshArea (inside the walls)Hardcore A x 0.2; sand blinding A; anti-termite A; DPM A; concrete A x H; mesh A; edge formwork L x H
Suspended slabAreaConcrete A x H; soffit formwork A; edge formwork L x H; reinforcement A x H x 90 kg
Ring beam 200 x 200 / 230 x 230LengthConcrete; formwork to both sides; reinforcement at 150 kg/m3
Suspended beam 230 x 450LengthConcrete L x 0.23 x 0.45; formwork L x (2 x 0.45 + 0.23); reinforcement at 160 kg/m3
Column 230 x 230 / 300 x 300CountConcrete N x 0.23 x 0.23 x H; formwork N x 4 x 0.23 x H; reinforcement at 200 kg/m3
External wall 200 mmLength (centre line)Walling L x H; plaster in, render out, paint both faces L x H each; DPC L
Internal wall 150 mmLengthWalling L x H; plaster and paint 2 x L x H; DPC 150 mm L
Eaves; ridgeLengthFascia board and gutter L; ridge capping L
Ceiling: gypsum board on brandering, paintedAreaBoard A; brandering A x 2 / 0.6 m; paint A
Concrete paving 100 mm on hardcoreAreaHardcore A x 0.15; concrete A x 0.1; edge formwork L x 0.1
Door completeCountDoor set N; ironmongery N; paint 2 x N x W x H; lintel N x (W + 0.4) x 0.2 x 0.15
Window completeCountWindow N; burglar bars N x W x H; sill N x W; lintel N x (W + 0.4) x 0.2 x 0.15
ExampleStrip foundation on a girth of 35.2 m, foundation walling 0.75 m high
Excavate trench, 35.2 x 0.6 x 0.919.008 m3
Blinding, 35.2 x 0.6 x 0.051.056 m3
Concrete, 35.2 x 0.6 x 0.24.224 m3
Foundation walling to DPC, 35.2 x 0.7526.400 m2
Backfill, 35.2 x (0.54 - 0.15 - 0.13)9.152 m3
Disposal, 35.2 x (0.15 + 0.13)9.856 m3
Anti-termite to trench bottoms, 35.2 x 0.621.120 m2
Backfill + disposal = the excavation19.008 m3

The DPC is measured with the wall (its width is the wall's: 200 mm under an external wall, 150 mm under an internal one), never with the foundation, so a building measured with both has its DPC once. Each piece of work is in one assembly only.

Good to know

The library is the firm's from the first day: change any formula, description or bill under Configuration › Take-off Assemblies. An upgrade of HodariQ never overwrites what the firm changed.

Good to know

Change the trench sizes in the strip foundation (0.6 x 0.9) to your own before using it. Choosing an assembly twice adds its items twice: delete the extra ones. Deleting a measurement deletes its items and their rows; a wall cannot be deleted while a door is still deducted from the same BoQ items, as they would go below zero: delete the door first.

← PreviousMeasure the planNext →Heights from sections

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Use one
  • The letters of a formula
  • How the quantity is worked out
  • How the BoQ item is found
  • The firm's assemblies
  • The Tanzanian library