HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • From the first estimate to the tender
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • Add-on modules
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor: the firm and each contract

Bills of Quantities

  • Checking an Excel BoQ
  • Build a BoQ
  • BoQ templates
  • BoQ assemblies
  • Import quantities
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Explain a quantity
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Check before tender
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Drawing sets: Start from Drawings
  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Measure the plan
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Quantity Register
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure
  • Bar Bending Schedules

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Plant and Equipment

  • The machine register
  • Import machines from Excel
  • Daily log
  • Charge machines to our contracts
  • Fuel
  • Hiring machines out
  • Service and repairs
  • Plant profit and alerts
  • Plant from the site phone

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Take-off

Drawing sets: Start from Drawings

A project's whole drawing set in one PDF: its pages sorted, the floor plans' scales read, their rooms, doors and windows measured in the background, each result marked by how sure the drawing makes it.

Start from Drawings

  1. 1Open Estimating › Start from Drawings.
  2. 2Choose the Contract and, if it has one, the BoQ to measure into (empty: a new BoQ is made).
  3. 3Choose the PDF with every page of the set, and the Floor to ceiling height for the walls of the rooms (0: floors only).
  4. 4Press Start. The take-off opens at once on the drawing; a Measuring mark at the top shows what is being done in the background.
  5. 5When it is done, To check opens with what was found. Accept the green ones, look at the others, then choose their BoQ items and Send to BoQ.

The pages of a set

Each page is sorted by its title, its largest writing: Floor plan, Roof plan, Elevation, Section, Structural (columns, beams, slabs, footings, reinforcement, stairs), Details, Cover or notes. Small writing (the notes about concrete grades and reinforcement on every sheet) never decides. A page whose title says nothing clear is sorted by what it shows: areas written in rooms and door marks make it a floor plan, whatever its title ("firts floor").

  • The page list at the top shows each page with what it is. Change it with the box beside it when it is wrong.
  • Measure All Plans measures the floor plans only: a cover or a page of reinforcement details is never measured.
  • A set opens on its first floor plan, not on its cover, and no scale is read on a cover.

A floor built several times

A typical floor ("2nd to 4th floor") is drawn once. On its page, set Built x to 3: everything measured on that page goes to the BoQ three times, on the measurement sheet as timesing (x 3), named "(x 3 floors)" so the dimension sheets show it.

ExampleFloor tiles of a typical floor
Office measured on the typical floor plan56.889 m2
Built x3
Sent to the BoQ item170.667 m2

In the background

A large architectural plan takes one to four minutes a page to read (thousands of lines, hatching, text). That is longer than a web request may last, so each page is a job done by the server's scheduled work, one after the other: the screen shows each page waiting or measuring with its seconds, and you keep working. A page that fails (no such page, a PDF the reader cannot open) is marked with why; the others go on.

  • The scale of each floor plan is read first: confirmed by its dimensions, it is used; only written on the page and not checked, the page is left for you to confirm the scale, then Measure the Plan on it.
  • Dimensions written in metres (2.500) are read as metres even where the title block says "All dimensions in mm" (ArchiCAD's default): 2.500 is 2.5 m either way.

How sure each measurement is

MarkWhenWhat to do
Green: ConfirmedThe room is the zone the architect's program drew (ArchiCAD, Revit), or the area written in the room ("A: 37.063 m2") agrees within 2%. Door and window marks counted.Accept the confirmed accepts them together.
Yellow: Look at itNothing on the drawing to check it against: no zone, no area written. Doors counted by their swings.Look at its outline on the drawing, then Accept.
Red: DiffersThe area written in the room does not agree with what was measured (a room open to a corridor, a colour that does not fill the room).Measure it again with Room or Area, or by hand.

I looked at each: accept all accepts every one still to check: use it only after looking at the yellow and red ones. Nothing goes to the BoQ before it is accepted.

Rooms drawn as zones

ArchiCAD and Revit colour each room (a zone) and write its area in it. A room name inside such a colour is that zone, exactly as drawn, even when the program filled it in several pieces split along the grid lines: touching pieces of one colour are one room, its area the sum of theirs. The edges of a light colour are never taken for walls; the dark fill of cut walls and columns is.

Hatched floors

Floor tiles and terrazzo drawn as fine lines a few hundred millimetres apart look like the two faces of a wall. On a page where the walls are drawn with a heavier pen than a mass of fine lines, the fine lines are left out when rooms are found.

Doors without marks

When a plan has no door marks (D1, D2...), its doors are counted by their swings: an arc as wide as a door leaf (0.5 to 1.6 m), drawn open a quarter turn or at 45 degrees. Two leaves meeting in the middle of the opening are one double door. They are listed by width (Door 0.8 m, Door 0.9 m) to look at: type their height so their openings are deducted from the walls.

Good to know

Scanned drawings have no lines or text to read: their scale is set by hand and they are measured with the tools. Windows without marks are not counted by themselves: count them with Count or Same Symbols. Notes written in rooms (a sill height, a floor finish, an area) are never taken for room names.

← PreviousCompare revisionsNext →Start a take-off

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Start from Drawings
  • The pages of a set
  • A floor built several times
  • In the background
  • How sure each measurement is
  • Rooms drawn as zones
  • Hatched floors
  • Doors without marks