HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • From the first estimate to the tender
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • Add-on modules
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor: the firm and each contract

Bills of Quantities

  • Checking an Excel BoQ
  • Build a BoQ
  • BoQ templates
  • BoQ assemblies
  • Import quantities
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Explain a quantity
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Check before tender
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Drawing sets: Start from Drawings
  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Measure the plan
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Quantity Register
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure
  • Bar Bending Schedules

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Plant and Equipment

  • The machine register
  • Import machines from Excel
  • Daily log
  • Charge machines to our contracts
  • Fuel
  • Hiring machines out
  • Service and repairs
  • Plant profit and alerts
  • Plant from the site phone

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Bills of Quantities

BoQ assemblies

A few sizes of a piece of work give every item that goes with it: a wall its walling, plaster, paint and DPC; a strip foundation its trench to its disposal; a length of road every layer. The formulas, how the items are found in the BoQ, and the firm's own assemblies.

An assembly turns a few sizes typed on the BoQ into the quantities of every item that goes with that piece of work, as a QS works them out on dimension paper. No drawing is needed (on a drawing, the take-off has its own assemblies). Each quantity is written into its item's dimensions with its working, so Explain a quantity shows how it was reached.

Add work from an assembly

  1. 1In the BoQ editor press From an assembly (foot of the sheet).
  2. 2Choose the kind of work and the assembly; type where it is (e.g. Wall W1, ground floor), how many identical, and its sizes. Each size comes with its usual value.
  3. 3Press Work Out the Items: each item with its working (12.5 x 3 - 3.6) and quantity, and the item of the BoQ it goes to.
  4. 4Check Goes to: Found items are clearly the right ones; Look at it means several items of the BoQ could be it: confirm the one proposed (Right), choose another, or empty it for a new item; New item is made in its bill.
  5. 5Press Add to the BoQ.

How an item of the BoQ is found

  • Only items in the same unit are considered.
  • The words of the assembly item are compared with each description; an item in the bill named by the assembly (Walling, Finishings...) counts a little more.
  • Found: the best fits well and clearly better than the next. Look at it: it fits, but another is close (three block walls of 150, 200 and 230mm). New item: nothing fits; a new item is made in a bill of that name, or a new bill.
  • Nothing is added before every Look at it is confirmed or changed.

HodariQ's standard assemblies

AssemblySizesItems and formulas
Block wall with plaster and paintL length, H height, O openings (m2), S faces (0, 1, 2)Walling L x H - O (m2); plaster and paint S x (L x H - O) (m2); DPC L (m)
Strip foundationP length, B width, D depth, F footing, BL blinding, TW wall thicknessExcavation P x B x D (m3); blinding P x B (m2); footing P x B x F (m3); walling below ground P x (D - BL - F) (m2); backfill P x (B - TW) x (D - BL - F) (m3); disposal P x B x (BL + F) + P x TW x (D - BL - F) (m3)
Ground floor slab on hardcoreL, WHardcore, anti-termite, DPM, 150mm bed, mesh: L x W (m2); edge formwork 2 x (L + W) (m)
Suspended slabL, WSlab, soffit formwork, soffit plaster and paint: L x W (m2); edges 2 x (L + W) (m)
Reinforced concrete columnsN number, B, D section, H heightConcrete N x B x D x H (m3); formwork N x 2 x (B + D) x H (m2)
Reinforced concrete beamsL total length, B, DConcrete L x B x D (m3); formwork to sides and soffit L x (B + 2 x D) (m2)
Column basesN, B, W, T base, D pit depth, WS working spaceExcavation N x (B + 2 x WS) x (W + 2 x WS) x D (m3); blinding N x B x W (m2); concrete N x B x W x T (m3); formwork N x 2 x (B + W) x T (m2)
Room finishesL, W, H, O openings, DW door widthsBed and floor tiles L x W; skirting 2 x (L + W) - DW; wall plaster and paint 2 x (L + W) x H - O; gypsum ceiling and paint L x W
Pitched roof coveringA plan area, F slope factor, R ridges, E eavesSheets A x F (m2); ridge R; fascia and gutter E (m)
Paved road sectionL, W carriageway, SH shoulder, T1 subbase, T2 base, T3 shoulder, ML marking linesRoadbed L x (W + 2 x SH); subbase L x (W + 2 x SH) x T1; base L x W x T2; shoulders L x 2 x SH x T3; prime and surfacing L x W; markings L x ML / 1000 (km)
Gravel road sectionL, R reserve, W, T, DR drainsClearing L x R; roadbed L x W; gravel L x W x T; side drains L x DR
Pipeline in trenchL, B, D, S beddingExcavation L x B x D; bedding L x B x S; backfill L x B x (D - S); disposal L x B x S; pipe L
ExampleA strip foundation 40 m long, trench 0.6 x 0.9 m, footing 0.2 m, blinding 0.05 m, wall 0.23 m
Excavation 40 x 0.6 x 0.921.600 m3
Backfill 40 x (0.6 - 0.23) x (0.9 - 0.05 - 0.2)9.620 m3
Disposal 40 x 0.6 x (0.05 + 0.2) + 40 x 0.23 x (0.9 - 0.05 - 0.2)11.980 m3
Backfill + disposal = excavation21.600 m3

The slope factor of a roof is 1 / cos(slope): 1.04 for 15 degrees, 1.10 for 25 degrees, 1.15 for 30 degrees. The working space of column bases is 0 by default: the standard method of East Africa measures excavation net to the base.

The firm's own assemblies

  • Configuration > BoQ Assemblies: duplicate a standard one to change it, or make a new one.
  • Sizes asked: a letter or a few letters and figures (L, H, TW, T1; not X), the question asked, its usual value.
  • Items given: the BoQ description of a new item, its unit, its formula, the bill it goes to and the words that find it.
  • A formula uses figures, the letters of the sizes, + - x / and brackets: 2 x L x H, L x (B - TW) x (D - 0.05). Write x between terms (with spaces between two letters: L x H). A formula that uses anything else cannot be saved.

Good to know

A quantity that works out below zero (openings larger than the wall) stops the assembly with its item named: check the sizes.

← PreviousBoQ templatesNext →Import quantities

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Add work from an assembly
  • How an item of the BoQ is found
  • HodariQ's standard assemblies
  • The firm's own assemblies