HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • From the first estimate to the tender
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • Add-on modules
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor: the firm and each contract

Bills of Quantities

  • Checking an Excel BoQ
  • Build a BoQ
  • BoQ templates
  • BoQ assemblies
  • Import quantities
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Explain a quantity
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Check before tender
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Drawing sets: Start from Drawings
  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Measure the plan
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Quantity Register
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure
  • Bar Bending Schedules

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Plant and Equipment

  • The machine register
  • Import machines from Excel
  • Daily log
  • Charge machines to our contracts
  • Fuel
  • Hiring machines out
  • Service and repairs
  • Plant profit and alerts
  • Plant from the site phone

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Bills of Quantities

Import quantities

The Excel of quantities a take-off firm sends back, matched to the items of the BoQ: by reference, by the same description, or by the closest words when clearly the best; every quantity traceable to its file and row.

Many QS firms prepare the BoQ themselves and have the quantities measured outside. Their file, a Description and a Quantity column (often an item reference and a unit), is read and each row matched to the item of the BoQ it measures. The quantities are written as rows of each item's dimensions, named with the file, sheet and row, so Explain a quantity shows where each figure came from.

Import

  1. 1Start the BoQ first (a template, Excel or a past project): the quantities go into its items.
  2. 2In the BoQ editor: Import > Quantities from a take-off. Choose the file and Replace or Add, then Read the File.
  3. 3Every row of the file with a description and a quantity above zero is listed, on every visible sheet whose column titles (in the first 40 rows) include a Description and a Quantity.
  4. 4Check the rows marked Look at it: tick Right when the item proposed is the right one, or choose another. Not found rows are left out unless you choose an item for them.
  5. 5Press Import the Quantities.

How a row is matched, the surest first

StepRuleShown as
1. ReferenceThe row's item reference is the reference of one item of the BoQ (2/A), in a compatible unitMatched, fit 100
2. DescriptionThe row's description is the description of one item, word for word (spaces and capitals aside), in a compatible unitMatched, fit 100
3. Closest wordsIn the same unit, the description sharing the most words; matched when its fit is 75 or more and 15 better than the nextMatched
Fit 45 to 75, or another item closeLook at it: the best proposed, the QS confirms
Below 45, or nothing in that unitNot found

A unit is compatible when both are the same or one is missing (sq.m reads as m2). Figures in a description weigh: grade 25 never matches grade 30 by its words alone.

Replace or add

ModeWhat happens to an item
Replace (usual)The rows of an earlier import are taken off and a quantity typed by hand is replaced: importing the same file twice does not count it twice.
AddEverything already there is kept (a typed quantity becomes its first row) and the imported rows are added.

Measurements from a drawing, Quick Measure, a bar schedule or dimensions typed by hand are always kept: the imported rows are added to them.

ExampleTwo rows of the file to one item
takeoff.xlsx, Sheet1 row 3: 50mm blinding22.000 m2
takeoff.xlsx, Sheet1 row 5: 50mm blinding3.000 m2
Quantity of the item 2/Q 50mm blinding25.000 m2
← PreviousBoQ assembliesNext →Lines, sums and totals

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Import
  • How a row is matched, the surest first
  • Replace or add