HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • From the first estimate to the tender
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • Add-on modules
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor: the firm and each contract

Bills of Quantities

  • Checking an Excel BoQ
  • Build a BoQ
  • BoQ templates
  • BoQ assemblies
  • Import quantities
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Explain a quantity
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Check before tender
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Drawing sets: Start from Drawings
  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Measure the plan
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Quantity Register
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure
  • Bar Bending Schedules

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Plant and Equipment

  • The machine register
  • Import machines from Excel
  • Daily log
  • Charge machines to our contracts
  • Fuel
  • Hiring machines out
  • Service and repairs
  • Plant profit and alerts
  • Plant from the site phone

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Bills of Quantities

Build a BoQ

The BoQ editor: the bills on the left, one bill as a sheet typed like a spreadsheet, the library suggesting descriptions and rates, several lines at a time, Undo.

A Bill of Quantities in HodariQ belongs to one contract. It is split into bills (Preliminaries, Substructure, Frame...), each bill holds its lines, and every amount and total works itself out as you type. You build it in the BoQ editor: as quick to type as Excel, with nothing in it that can add up wrong.

Start a BoQ

An empty BoQ opens on four ways to start it:

ChoiceWhat happens
From a templateThe usual bills and items of the kind of project (a house, a multi-storey building, a warehouse, a road...), quantities empty. See BoQ templates.
Import ExcelThe BoQ you already have in Excel: its columns are found and its arithmetic checked. See Import from Excel.
Copy a past projectThe bills and items of an earlier BoQ of the firm, its rates kept or not.
Type it hereAn empty sheet; the library suggests as you type.

The screen

PartWhat it shows
Top barThe contract, the BoQ and its status, the Total in TZS and, when the gross floor area is known, the cost per m2. Chips appear only when there is something to do: Excel errors, Without quantity (lines left without a quantity), Library rates changed. Then Check, Import and More.
Bills (left)Every bill with its number, title and total; a dot marks a bill with lines still without quantity. Click a bill to open it; drop lines on it to move them there.
Bill barThe bill number and title (type over them), Find a line, and Only without quantity when some are left.
SheetRef, Description, Unit, Qty, Rate, Amount. Figures show with their thousands (1,800,000) and are typed without. The kind of a line that is not a measured item shows after its description (PC Sum, Provisional Sum, % addition...).
FootAdd an Item, a Section, a Note, or work From an assembly; the number of lines, how many have no quantity, the keys, and the bill total.

Typing

  1. 1Press + Item: the new line's description is ready to type.
  2. 2Type three letters or more: the library and the firm's past BoQs suggest the items that fit, with their unit and rate. Enter (or a click) takes one: the description, unit and rate are filled, and the cursor goes to the quantity.
  3. 3Type the quantity. The amount and every total follow when you leave the cell.
  4. 4Enter goes down to the same column; on the last line it adds a new one. Tab goes across. The arrows go up and down (in a description, once at its first or last line).

Suggestions: where they come from

SourceRate shownOrder
The firm's rate libraryThe library rate, linked to the line (its rate is checked against the library later)The region of the contract first, other regions after
The firm's past BoQsThe median of the rates the same description and unit were priced at, with the number of projectsAfter the library when both fit equally

A suggestion fills a description, a unit and a rate. It never fills a quantity.

Keys

KeyDoes
EnterNext line, same column; a new line at the end. In a description, Shift+Enter starts a new line of text.
Tab / Shift+TabNext / previous column
Up / DownLine above / below
Ctrl+DDuplicate the line (or the lines chosen), with its dimensions, numbered as new items
Ctrl+ZUndo the last change: a value, a line added, lines deleted (put back with their dimensions), a move, a bill renamed. Inside a cell being typed, Ctrl+Z first undoes the letters.
Ctrl+CWith lines chosen: copy them as Excel rows (Ref, Description, Unit, Qty, Rate)
Ctrl+VPaste rows copied in Excel: they are added at the end of the bill
DeleteWith lines chosen (and no cell being typed): delete them
EscClose a menu; clear the choice of lines

Several lines at a time

  • Point at a line: its choice box shows. Tick it; Shift+click another box chooses every line between them; the box in the column titles chooses every line shown.
  • The bar of the lines chosen: Duplicate, Move up, Move down, Move to bill..., Copy, Delete.
  • Drag lines by their grip (left of the box) to another place in the bill, or onto a bill on the left.
  • A % addition moved to another bill without the PC sum it was added to loses that link (they must be in one bill); references of lines moved to another bill are renumbered in it.

A line's menu

The ... at the end of a line: Dimensions (timesing), insert an item or a section below, duplicate, its kind (measured item, section, heading / note, preliminaries, provisional sum, prime cost sum, dayworks, % addition, contingency) and delete.

Dimensions (timesing)

A line's quantity can be the total of its dimensions, as on dimension paper: each row is times x No. x L x W x H (the sizes filled in), a Ddt row is taken off. The quantity then shows underlined: click it to see or change its rows.

ExampleExcavation to a strip foundation
Grid A-D, external walls: 1 x 1 x 48.6 x 0.6 x 0.926.244 m3
Grid 2, internal wall: 1 x 1 x 9.2 x 0.6 x 0.94.968 m3
Quantity of the line31.212 m3
  • A quantity typed before the first dimension row is kept as a row (Quantity typed before), so nothing typed is lost; delete that row if the dimensions replace it.
  • Rows from a drawing, a bar schedule, Quick Measure, an imported file or an assembly are shown, and are changed where they come from.
  • A line with dimensions does not take a typed quantity: change its rows, or delete them to type a quantity.

Lines without quantity, library rates

  • Without quantity (top bar) lists every item with no quantity and nothing measured, and lump sums with neither quantity nor amount, then deletes them in one go. A BoQ started from a template or a past project is finished this way. Ctrl+Z puts them back.
  • Library rates changed: lines priced from the library keep their own copy of the rate; when the library changes, this lists each line with its rate and the library's, and brings them up to date in one go.

More

  • Start from a template, Copy a past project, Save as a template (the bills and lines without quantities, for the firm's next projects).
  • Renumber this bill: references 2/A, 2/B... in grid order (letters I and O are never used).
  • Quick Measure, Export to Excel (priced, or for tender with the rates blank), Print, and Revisions, tender and lock (the BoQ's full form).

Rules

  • Only QS staff (QS Officer and Senior QS / Manager) change a BoQ, and only while it is a Draft or Tender. A Contract BoQ or a superseded revision opens read only.
  • No quantity, rate or % below zero: omissions are made by variation orders.
  • A bill can be removed only when it is empty.
  • Every amount is quantity x rate rounded to the shilling; a % addition is its % of the PC sum, dayworks or provisional sum it is added to.
← PreviousChecking an Excel BoQNext →BoQ templates

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Start a BoQ
  • The screen
  • Typing
  • Suggestions: where they come from
  • Keys
  • Several lines at a time
  • A line's menu
  • Dimensions (timesing)
  • Lines without quantity, library rates
  • More
  • Rules