HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • From the first estimate to the tender
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • Add-on modules
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor: the firm and each contract

Bills of Quantities

  • Checking an Excel BoQ
  • Build a BoQ
  • BoQ templates
  • BoQ assemblies
  • Import quantities
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Explain a quantity
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Check before tender
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Drawing sets: Start from Drawings
  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Measure the plan
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Quantity Register
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure
  • Bar Bending Schedules

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Plant and Equipment

  • The machine register
  • Import machines from Excel
  • Daily log
  • Charge machines to our contracts
  • Fuel
  • Hiring machines out
  • Service and repairs
  • Plant profit and alerts
  • Plant from the site phone

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Take-off

Measure the plan

Every named room and every door and window mark of a page measured at once, then checked and accepted before it goes to the BoQ.

Measure the Plan runs the tools you would use one by one on a CAD plan, on the whole page at once: All Rooms (the floor and the walls of every room whose name is written in it) and Doors & Windows (every door and window mark, with its size from the schedule). Nothing it finds goes to the BoQ by itself: every measurement is marked To check until you have looked at it.

  1. 1Open the plan. The scale must be set and confirmed (green, or confirmed with Confirm Scale).
  2. 2Press Measure the Plan. Type the Height floor to ceiling for the walls (3 m first), then press Measure the Plan in the panel.
  3. 3The panel To check lists what was added, and each outline is drawn on the plan in its colour. Click p.1 on a line to see it.
  4. 4Look at each outline. A room that runs into a balcony, or a mark found twice, is removed with the bin and measured by hand.
  5. 5Press Accept on each line, or Accept All once you have looked at them all.
  6. 6Open the By BoQ item tab. The assemblies have already chosen most BoQ items by their words; choose the rest once per line, or press Create the BoQ items to make the missing ones. Then press Send to BoQ.

What is added

FoundAdded asWith
A room with its name written in itROOM - floor: an area inside its wallsThe room floor assembly (screed, tiles, ceiling, skirting) when the firm has one named Room...
The same roomROOM - walls: its perimeter x the height typedThe room walls assembly (plaster, paint) when a height is typed
A door or window mark (D01, W05)A count of its marks on the plan, named with its size: D01 (door) 900 x 2100The openings assembly, deducting each opening from the walling, plaster and paint, when its size is known

Rules

  • Only CAD drawings: a scanned page has no names or marks to read, and the panel says so.
  • A page whose scale is only written (orange, not checked) is refused until the scale is confirmed.
  • A measurement To check cannot be sent, and neither can its assembly items: Send says to accept it first.
  • Running it again adds only what is not on the page yet: a room whose floor is already measured, or a mark already counted, is left as it is and the message says how many.
  • Names the room tools never measure by themselves (stairs, balconies, verandas, terraces, porches) and rooms open to another space are listed as Not measured: measure them with Room, Area or Length.
  • Same symbols (sockets, WCs, lights) are not part of it: box one with Same Symbols.
  • The header shows To check with the number waiting while any is left; Review lists them too.
ExampleA two-room house at 1:50 (rooms 4.2 x 4.6 and 3.2 x 4.6 inside), walls 3 m high
BEDROOM - floor4.2 x 4.6 = 19.32 m2
BEDROOM - walls(4.2 + 4.6) x 2 = 17.6 m x 3 = 52.8 m2
LOUNGE - floor3.2 x 4.6 = 14.72 m2
LOUNGE - walls(3.2 + 4.6) x 2 = 15.6 m x 3 = 46.8 m2
D01, D02, W011 each, with 900 x 2100, 1000 x 2100 and 1200 x 1200 from the schedule
To check7 measurements, then Accept All

Good to know

Measure the Plan reads lines and words that are in the PDF: what it finds is exact where the drawing is, and that is why you still look at every outline before accepting it. It is the difference between measuring and checking.

← PreviousDoors, windows and symbolsNext →Assemblies

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • What is added
  • Rules