HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • From the first estimate to the tender
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • Add-on modules
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor: the firm and each contract

Bills of Quantities

  • Checking an Excel BoQ
  • Build a BoQ
  • BoQ templates
  • BoQ assemblies
  • Import quantities
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Explain a quantity
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Check before tender
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Drawing sets: Start from Drawings
  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Measure the plan
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Quantity Register
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure
  • Bar Bending Schedules

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Plant and Equipment

  • The machine register
  • Import machines from Excel
  • Daily log
  • Charge machines to our contracts
  • Fuel
  • Hiring machines out
  • Service and repairs
  • Plant profit and alerts
  • Plant from the site phone

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Plant and Equipment

Fuel

Each fill with its litres, price and meter; the use per hour or per 100 km and its check; fuel charged to the job.

The Fuel button on a machine's card keeps every fill of that machine. Most fills are typed in the Fuel (L) column of the daily log; the button is for the details (price, receipt, bought from). Fuel is a cost of the machine (Plant profit); for a machine whose rate leaves the fuel out, fuel filled on a contract is a cost of that contract too.

  1. 1On the daily log, type the litres in Fuel (L); or open the machine, press Fuel and New for a fill with its receipt.
  2. 2The Date, the Machine, the Litres and the Price a litre (the last price of that machine comes by itself). Amount = litres x price.
  3. 3The Meter at the fill: without it the use cannot be worked out.
  4. 4The Contract comes from where the machine stands. Bought from and the Receipt are for the records.

The use and its check

From two fills with a meter reading, the use is the litres of this fill / the meter run since the fill before: litres an hour for a machine, litres per 100 km for a vehicle. On the machine's card, Expected fuel use says what it should use; a fill above it by more than the Fuel use tolerance of Settings (20% by default) is shown in red, flagged Above the expected use, and raises an alert for the Senior QS / Managers for a month.

ExampleEX-01 excavator, expected 18 L an hour, tolerance 20% (up to 21.6)
1 Oct: 400 L at 8,000 hoursfirst fill: no use yet
2 Oct: 180 L at 8,010 hours180 / 10 = 18 L an hour: fine
3 Oct: 300 L at 8,020 hours300 / 10 = 30 L an hour: flagged

A vehicle: 100 L between 212,000 km and 212,400 km is 100 / 400 x 100 = 25 L per 100 km.

Fuel charged to the job

With Fuel charged to the job ticked on the machine (its internal rate is a dry rate), every fill on a contract we build becomes a cost of that contract, head Plant, named "Fuel 150 L, TP-04 Isuzu FVZ tipper". The cost follows the fill: change the litres or the price and it changes; delete the fill and it goes. A fill without a contract, or on a contract we do not build, stays a cost of the machine only.

Good to know

A flagged fill is a question, not a verdict: a meter not read, a fill for two days, a leak or theft. Check it with the operator. The site team can record fuel from their phones; the office then checks the price.

← PreviousCharge machines to our contractsNext →Hiring machines out

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • The use and its check
  • Fuel charged to the job