HodariQ
Ctrl K
Back to siteBook a demo

Getting started

  • How HodariQ works
  • From the first estimate to the tender
  • Set up your firm
  • Country, currency and dates
  • Users and roles
  • Approvals
  • Sending documents: e-mail and WhatsApp
  • The change log
  • Plans and limits
  • Features and switches
  • Add-on modules
  • What must come first

Contracts

  • Create a contract
  • Commercial terms
  • Key dates and contract states
  • The contract workspace
  • Programme of works
  • Parties
  • Completion and closing
  • Consultant or contractor: the firm and each contract

Bills of Quantities

  • Checking an Excel BoQ
  • Build a BoQ
  • BoQ templates
  • BoQ assemblies
  • Import quantities
  • Lines, sums and totals
  • Units
  • Measurement sheets
  • Explain a quantity
  • Import from Excel
  • How the import reads a file
  • Paste and copy
  • Rates and build-ups
  • Price list, regions and the Price Book
  • Print the BoQ
  • Export to Excel
  • Check before tender
  • Tender, lock and revise
  • Compare revisions

Take-off

  • Drawing sets: Start from Drawings
  • Start a take-off
  • The screen, keyboard and tablet
  • The scale
  • Lengths, areas and counts
  • Rooms: one click or every room
  • Roofs and wall centre lines
  • Doors, windows and symbols
  • Measure the plan
  • Assemblies
  • Heights from sections
  • Zones
  • Send to the BoQ
  • Quantity Register
  • Print the take-off
  • Check a take-off
  • Revised drawings
  • Revision to a variation order
  • Queries to the architect
  • Quick Measure
  • Bar Bending Schedules

Tenders

  • Tender analysis
  • Tenderers and their rates
  • Checks and ranking
  • Award and the tender report

Variations

  • Variation orders
  • Pricing VO lines
  • Approving a variation order
  • VO from revised quantities
  • The VO document and the register
  • Extensions of time

Valuations and certificates

  • The monthly valuation
  • How the certificate is worked out
  • Retention and its release
  • Advance payment and its recovery
  • Liquidated damages
  • Measurement sheets
  • Submitting, certifying and freezing
  • Claimed and certified
  • Printing certificates

Money

  • Invoices and payments
  • Withholding tax and VAT
  • Who owes what
  • Financial statement
  • Cost control
  • Budget line by line
  • Recording costs
  • LPOs (purchase orders)
  • Suppliers and their prices
  • Schedule of materials
  • Subcontracts
  • Subcontractor certificates
  • Cost plans

Site Portal

  • Add your site team
  • On site: the phone pages
  • The daily report from the phone
  • Chats and photos
  • Notifications on the phone
  • Material requests at the office
  • Who approves, and the settings
  • Daily reports at the office
  • Work done, item by item
  • Who sees what

Plant and Equipment

  • The machine register
  • Import machines from Excel
  • Daily log
  • Charge machines to our contracts
  • Fuel
  • Hiring machines out
  • Service and repairs
  • Plant profit and alerts
  • Plant from the site phone

Inbox and Work

  • How the Inbox works
  • Connect the mailbox
  • How e-mails are sorted, summarised and dated
  • Which contract an e-mail is about
  • Check and approve e-mails
  • My work: reply, notes and Done
  • Alerts, the morning e-mail and the contract

Bids and the NeST scout

  • How bids work
  • Bid or no bid, and the documents
  • Results, the win rate and the contract
  • The NeST scout
  • Bid alerts

Team

  • Team: who has how much work

Registers and alerts

  • Bonds, insurance and documents
  • Alerts
  • The dashboard and the financial statement
  • The contractor portal
Ctrl K
Docs/Take-off

Bar Bending Schedules

Every bar of the beams, columns and slabs: its length to BS 8666, its weight, the kg of each size on the BoQ, the schedule for the steel fixer and the stock bars to order.

A Bar Bending Schedule lists each bar mark of the structural drawings: the member, the size, how many, the shape and its dimensions. HodariQ works out the length of each bar (taking off its bends as BS 8666 does), its weight, the kg of each size for the BoQ, and how many 12 m stock bars to order. It is in Estimating › Bar Bending Schedules (Professional and Enterprise; switched in Settings › Features).

Make a schedule

  1. 1Press New. Type the Schedule name (e.g. BBS 01 Ground floor beams), choose the Contract and the BoQ in Send to BoQ, and type the Drawings it comes from.
  2. 2Check Round lengths up to (mm) (25) and Stock bar length (m) (12).
  3. 3In Bars, add one row per bar mark: Member (B1), Mbrs (how many members alike), Type (Y high yield, R mild steel), Size, then either No. each (bars in each member) or Span and Spacing (links and slab bars: the number is worked out), the Shape code and its dimensions A to E in mm.
  4. 4The Mark (01, 02...) is given in order when left empty. Total no., Length (mm), Total (m) and kg fill in as you type.
  5. 5Open By size for the kg of each size and the stock bars, Print for the schedule.

The length of a bar (BS 8666)

Dimensions are outside dimensions, as on the drawing. Each bend takes off an allowance that depends on the radius of the bend r and the bar diameter d. The length is then rounded up to the schedule's step (25 mm).

Shape codeShapeLength of one bar
00StraightA
11One bend (L)A + B - 0.5r - d
13Semicircular bendA + 0.57B + C - 1.6d
21Two bends (U)A + B + C - r - 2d
31Three bendsA + B + C + D - 1.5r - 3d
41Four bendsA + B + C + D + E - 2r - 4d
51Closed link2(A + B + C) - 2.5r - 5d
63Closed link, hooks overlapping2A + 3B + 2C - 3r - 6d
99OtherThe length typed in Length typed (mm)
Diameter (mm)6810121620253240
Mass (kg/m), BS 8666 Table 10.2220.3950.6170.8881.5792.4663.8546.3139.864
Radius r of a Y bar (mm), Table 212162024327087112140

An R (mild steel) bar bends on a radius of 2d. The number of bars over a span is span / spacing, rounded down, plus 1 (4,000 at 200 gives 21). Total no. = members x bars in each; total length = total no. x cut length; weight = total length x mass per metre, to 3 decimals.

ExampleBeam B1, 4 alike: 3 Y16 bottom bars bent up, 2 Y12 top bars, Y8 links at 200
Y16 shape 21, 300 + 4,000 + 300 - 32 - 2 x 16 = 4,536, cut 4,550; 12 bars, 54.6 m x 1.57986.213 kg
Y12 shape 00, 4,600; 8 bars, 36.8 m x 0.88832.678 kg
Y8 shape 51, 2(400 + 180 + 100) - 2.5 x 16 - 5 x 8 = 1,280, cut 1,300; 21 each, 84 bars, 109.2 m x 0.39543.134 kg
Total162.025 kg

Stock bars to order

For each size, the bars are cut from stock bars: the longest first, each from the first stock bar it fits in. By size shows the stock bars, the offcut in kg, and the bars longer than a stock bar (Longer than a stock bar): lap them or order them to length. In the beam above: Y16 6 stock bars, Y12 4, Y8 10.

Send the kg to the BoQ

  1. 1Press Send to BoQ. HodariQ looks for an item in kg whose description names each size (16 mm or Y16; R bars only on an item that says mild).
  2. 2A size with no item is listed in BoQ items: choose its item there, or press Create the BoQ items to make one per size in Concrete work (High yield steel bar reinforcement to BS 4449, 16 mm diameter (Y16), cut, bent and fixed).
  3. 3Each size becomes one row of its item's measurement sheet, named after the schedule and the size, its quantity the kg.
  • The rows follow the schedule: change a bar, add one or delete one, and the kg on the BoQ change at once, while the BoQ can change.
  • An item that had a quantity typed before keeps it as its first row, Quantity before measuring.
  • Only to an item in kg; a locked BoQ (Contract BoQ) is refused: its quantities change through variation orders.
  • Explain on the item shows the bars sign and which schedule and size each kg comes from.

The printed schedule

A4 landscape in the BS 8666 layout the steel fixer works from: member, bar mark, type and size, number of members, bars in each, total number, length of each bar, shape code, A to E, total length and weight, with the totals; then a page of the weights by size and the stock bars to order, and Prepared by / Checked by / Date.

Good to know

A bar with a dimension missing for its shape, a negative figure, no member or a size not in the table is refused with its member and mark named. The take-off's reinforcement items (kg per m3 of concrete) are an estimate: when the schedule is done, send the schedule and remove those rows, or the steel is counted twice.

← PreviousQuick MeasureNext →Tender analysis

Something unclear? Ask us on WhatsApp: we answer the same day.

On this page

  • Make a schedule
  • The length of a bar (BS 8666)
  • Stock bars to order
  • Send the kg to the BoQ
  • The printed schedule